1.Turn on power to the monitor and to all external devices.

2.Press and release the workstation Power button on the front panel (FIGURE 1-3).

3.After several seconds, verify that the power-indicator LED on the Power button lights.

The power-indicator LED on the Power button lights after the workstation begins the internal booting process (FIGURE 1-3).

If you experience problems during power on, see “Troubleshooting the Sun Blade 2500 Workstation” on page 35.

Tip – After you power on the workstation for the first time, you are ready to set up the preinstalled Solaris 8 2/04 and Solaris 9 9/04 Operating System software. Go to “Planning the Installation Process for Solaris” on page 11.

Powering Off the Workstation

TABLE 1-1describes two methods for powering off the workstation.

TABLE 1-1Powering Off the Workstation

Method

Instructions

 

 

Method 1

1. Close and save any open applications.

2.Press the Sleep key (or press and release the Power button).

3.Select Shutdown.

Method 2

1.

Close and save any open applications.

 

2.

As superuser, type: shutdown

 

 

 

Note – After powering off the workstation, always wait at least four seconds before powering on the workstation again.

Chapter 1 Setting Up the Sun Blade 2500 Workstation 9

Page 25
Image 25
Sun Microsystems 2500 manual Powering Off the Workstation, 1describes two methods for powering off the workstation