2.Slide the tube into the housing bushing that meets the air flow first. Position the tube so that the arrow points into the air flow, as shown in Figure 4.
3.Secure the tube flange to the housing bushing with two #6
4.For tubes longer than the width of the air duct, the tube should extend out of the opposite side of the duct. If there are more than 2 holes in the section of the tube extending out of the duct, select a different length using Table 1. Otherwise, trim the end of the tube protruding through the duct so that 1″ to 2″ (25 to 50mm) of the tube extend outside the duct. Plug this end with the end cap and tape closed any holes in the protruding section of the tube. Be sure to seal the duct where the tube protrudes.
NOTE: The sampling tube end cap is critical to the proper operation of the duct smoke detectors. The end cap is needed to create the proper air flow to the sensor of the duct smoke detector.
Figure 3. Installation of foam gaskets over sampling tube bushings:
SCREW HOLES FOR
ATTACHING HOUSING
TO DUCT WORK.
Table 1. Sampling tubes recommended for different duct widths:
Outside Duct Width | Sampling Tube Recommended* |
1 to 2 ft. (0.3 to 0.6 m) | |
2 to 4 ft. (0.6 to 1.2 m) | |
4 to 8 ft. (1.2 to 2.4 m) | |
8 to 12 ft. (2.4 to 3.7 m) |
*Must extend a minimum of 2⁄3 the duct width
Figure 4. Air duct detector sampling tube:
FLANGE | AIR HOLES | SAMPLING |
| ||
|
| TUBE |
|
| END CAP |
| ARROW | AIR FLOW DIRECTION |
MUST FACE |
INTO AIR FLOW | |
|
Figure 5. Tube mounting configurations with varying air flow direction:
| DOTS INDICATE POSITION OF |
| ||
| SAMPLING TUBE HOLES |
| ||
AIR FLOW |
|
| AIR FLOW | |
|
| DIRECTION | ||
DIRECTION |
|
| ||
|
|
| ||
DETECTOR |
|
| DETECTOR | |
HOUSING |
|
| HOUSING | |
| A. |
| B. | |
SAMPLING | EXHAUST | EXHAUST | SAMPLING | |
TUBE | TUBE | TUBE | TUBE | |
| HORIZONTAL MOUNTING OF HOUSING |
| ||
|
|
| DETECTOR | |
|
|
| HOUSING | |
|
| EXHAUST |
| |
AIR FLOW |
| TUBE | AIR FLOW | |
DIRECTION |
|
| DIRECTION | |
DETECTOR | SAMPLING |
| ||
C. | TUBE | D. | ||
HOUSING |
VERTICAL MOUNTING OF HOUSING
NOTE: Only metal sampling tubes can be installed in
orientations C and D.
[4.2] Installation For Ducts More Than 8 Feet (2.4m) Wide
NOTE: To install sampling tubes in ducts more than 8 feet (2.4m) wide, work must be performed inside the air duct. Sampling of air in ducts wider than 8 feet (2.4m) is accomplished by using the
Install the sampling tube as follows:
1.Drill a
2.Slide the sampling tube with the flange into the housing bushing that meets the air flow first. Position the tube so that the arrow points into the air flow. Secure the tube flange to the housing bushing with two #6
3.From inside the duct, couple the other sections of the sampling tube to the section already installed using the
4.Trim the end of the tube protruding through the duct so that 1″ to 2″ (25 to 50mm) of the tube extend outside the duct. Plug this end with the end cap and tape closed any holes in the protruding section of the tube. Be sure to seal the duct where the tube protrudes.
NOTE: An alternate method to using the
3 |