
2. Installation
INSTALLATION CONSIDERATIONS
!
ALERT
ALERT! This product must be installed and maintained only by qualified personnel. Verify all connections meet requirements specified in local electric codes or operating company guidelines before supplying power. Protect this equipment with a fuse or breaker sufficient to interrupt power levels specified in Section 1 of this manual.
—Tools and Equipment
•7/16 in. (or 12 mm) socket for
•9/16 (or 14 mm) socket for
•#2 Phillips screwdriver (screwdriver for
•standard electrical cabling tools (cable lacing, crimping and stripping tools, cable cutters, etc.)
—Technical Support
By
By phone:
INSPECTION
Compare the contents of the shipping container with the packing list. Call Telect if anything is missing.
NOTE
Telect is not liable for shipping damage.
If the shipping container is damaged, keep it for the carrier’s inspection. Notify the carrier and call Telect’s Customer Service Department:
Keep the container until you have checked equipment opera- tion. If you experience any kind of problem, call Telect’s Customer Service Department. Use the original, undamaged container if you are instructed to return the BDFB / BDCBB to Telect.
BAY LAYOUT
In a standard bay, each BDFB / BDCBB requires 10 EIA rack positions (10 RU). Up to four BDFB / BDCBB panels can populate a bay having either
Telect, Inc. • USA +1.509.926.6000 • Mexico +1.52.33.3836.3700 Poland +1.48.713.239.100 • UK +1.44.1489.889500 • www.telect.com
Copyright © 2002 Telect, Inc., All Rights Reserved • Telect Publication