3.0MAINTENANCE SCHEDULE

Teledyne API Model 201A NH3 Analyzer Instruction Manual, 04689, Rev. B1

3.0MAINTENANCE SCHEDULE

3.1M201A Maintenance Schedule

The maintenance requirements of the M201A are essentially like a standard M200A NOx analyzer. Please refer to Table 8-1 in the M200A Operator Manual for the M200A maintenance schedule.

In Table 3.1 below, there are the extra maintenance items required by the M201A.

Table 3.1: Preventative Maintenance Schedule

Item

Maintenance Interval

 

 

M501NH3 Converter

Check every 6 months

 

 

Reaction Cell

Clean quarterly as

 

necessary

 

 

AutoZero flow check

Quarterly as needed

 

 

Reference Section

Section 3.2

Sect 9.3.8, Fig 8-3 in the M200A Manual

Section 3.3

3.2 Maintaining the M501NH Converter

The M501NH Converter is operated at very high temperature. The center tube in the converter slowly oxidizes and requires replacement. The most obvious indicator of failure is no ammonia conversion, despite the converter being at temperature. This is caused by the oxidized tube breaking off in the converter.

The following procedure describes how to disassemble and replace converter parts. The various parts in the converter become delicate and brittle after prolonged exposure to high temperatures. It is therefore a good idea to have a complete set of replacement parts on hand before starting, as listed in Table 3.1.

18

Page 19
Image 19
Teledyne manual 3.0MAINTENANCE SCHEDULE, 3.1M201A Maintenance Schedule, Maintaining the M501NH Converter