Installation
Regardless of configuration, the analyzer/system must be installed on a level surface with sufficient space allocated on either side for personnel and test equipment access. Subject to the foregoing, the Analyzer/system should be placed as close to the sample point as is possible.
All pertinent dimensions, connecting points, and piping details can be found in the drawings section as part of the outline,
3.3 User Connections
All user connections are made on the rear panel. Consult the input- output and outline diagrams in the drawing section of the manual. Not all the features displayed may be present in your system. Refer to any Addenda for additional information that may apply to your instrument.
3.3.1 Electrical Power Connections
The standard analyzer requires a supply of
CAUTION: PRIMARY POWER TO THE SYSTEM SHOULD NOT BE SUPPLIED UNTIL ALL CUSTOMERS WIRING IS INSPECTED PROPERLY BY
3.3.2 Gas Connections
The analyzer gas connection diagram identifies the various gas connection points as to function and location. Figure
Teledyne Analytical Instruments | 16 |