Installation

Figure 3-1: Gas Connections

Gas connections to the instrument are made at the 1/8”or 1/4” stainless steel tube fittings provided on the rear panel. Note that the Purge and Sensor Vent fittings are 1/4” while all other gas connections are 1/8”.

If the Sample line is heat traced to avoid condensation, the User must ensure that a clean (2 micron or better filter) and heated sample, maintained at a constant temperature not exceeding 120 C, is delivered to the Sample Selector Module and the connection between the Sample Selector Module and the Model 4030 is similarly heat traced. The Sample Selector Unit contains provisions to accept tubing diameter in the range of 1.25 to 1.50 inches, typically the O.D. of the heat-traced lines.

It is recommended that all gas tubing leading to the connections on the back of the analyzer be of the coiled type. This will facilitate sliding the unit out of the case without disconnecting the gas supply to the analyzer.

Teledyne Analytical Instruments

17

Page 19
Image 19
Teledyne SERIES 4030, HEATED THC manual Installation