Model OT-2 System

Operation 3

 

 

 

 

 

 

 

 

 

Operation

Operation of the Model OT-2 System involves installing the unit, making appropriate sample gas connections, and calibration.

3.1Installation

WARNING: Safe operation of the system requires the user to properly ground the system, install the wiring and power the transmitter.

It is the user's responsibility to determine and in- stall, should a safety barrier be required.

Installation of the Model OT-2 System includes:

1.Unpacking

2.Mounting

3.Gas connections

4.Electrical connections

5.Installing the Micro-Fuel Cell

6.Testing the system.

3.1.1Unpacking the Analyzer

Carefully unpack the analyzer and inspect it for damage. Immediately report any damage to the shipping agent.

Teledyne Analytical Instruments

3-1

Page 19
Image 19
Teledyne operating instructions Model OT-2 System Operation, Installation