Teledyne 9060L, Percent Oxygen Analyzer Installation Checklist, Connections to Probe

Models: 9060L Percent Oxygen Analyzer

1 51
Download 51 pages 50.18 Kb
Page 29
Image 29

Percent Oxygen Analyzer

Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3-5: Connections to Probe

3.5 Installation Checklist

Prior to powering up the unit make sure you have:

Installed the unit correctly

Checked the probe and welded probe socket for leaks

Once the above checks have been made, you can connect the power source. Wait approximately 30 minutes for warm up, two hours wait is best. After that, the instrument is ready for operation.