To schedule downloads, follow these steps:

1.Under Download Schedule, set Scheduler to Enable.

2.To schedule a daily download period, select Daily and select a start time and end time.

To schedule a weekly download period, select Weekly and select a start day/time and end time/day.

3. Click Apply to save your changes.

NOTE

If the Download Scheduler is enabled, ALL download tasks will adhere to the designated schedule.

79

Page 79
Image 79
Thecus Technology N7700 user manual Under Download Schedule, set Scheduler to Enable