835961-UIM-D-0213

Air Side: System Total External Static Pressure

Supply static before indoor coil (in w.c.")

 

Supply static after indoor coil (in w.c.")

 

Return Static (in w.c.") before filter

 

Return Static (in w.c.") after filter (furnace side)

 

Total External Static Pressure

 

 

Maximum Rated ESP (in w.c.")

 

 

 

 

COOL

A

B

C

D

 

 

 

Cooling

ECM

ADJUST

A

B

C

D

 

&

 

DELAY

 

 

 

 

Heat Pump

 

A

B

C

D

 

 

Indoor

 

 

 

 

 

 

Blower Set-Up

X-13

1

2

3

4

5

 

PSC

Low

Medium Low

Medium

Medium High

High

Return Air: Dry Bulb

Wet Bulb

Supply Air: Dry Bulb

Temperature Drop

Outside Air: Dry Bulb

Supplementary

Heating

Indoor

Blower Set-Up

ECM

HEAT

A

 

 

B

C

 

D

X-13

1

2

 

 

3

4

 

5

PSC

Low

 

Medium

Medium

 

Medium

High

 

Low

 

 

High

 

 

 

 

 

 

 

Return Air: Dry Bulb

Wet Bulb

 

Supply Air: Dry Bulb

 

Temperature Rise

Defrost Control Board

Fill in the information ie.. "ON", "OFF" or the appropriate "Value" for the fields that apply to the defrost control board installed

YorkGuard VI

Demand Defrost

Time and Temperature

Part Number

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Low Temp Cut Out

 

Balance Point

 

 

Defrost Curve

 

Y2 Lock

 

 

 

 

 

 

 

 

 

 

 

 

 

FFUEL

Version Number

Switch Point

Hot Heat Pump

Bonnet Sensor Present

Run Time: Time and Temperature board only 30, 60 or 90 minutes

Refrigerant Charge and Metering Device

R-22

R-410A

TXV

Fixed Orifice

Additional Lineset Length

# Elbows

 

# 45s

 

 

 

Adder per foot - lbs.

Total Added - lbs.

Oz.

Oz.

Orifice Size

Liquid Line Temp

High Side Pressure

Suction Line Temp

Low Side Pressure

TXV #

Subcooling

Superheat

Cycle Test

Operate the unit through several heating cycles from the thermostat, noting and correcting any problems Operate the unit through continuous fan cycles from the thermostat, noting and correcting any problems Operate the unit through a cooling cycles, noting and correcting any problems

Operate the unit through an emergency heating cycles, noting and correcting any problems

Clean Up

Installation debris disposed of and indoor and outdoor areas cleaned up?

Continued on next Page

Johnson Controls Unitary Products

19

Page 19
Image 19
Thermo Products R-410A installation manual Air Side System Total External Static Pressure