FIGURE 18 - Horizontal Vent Terminal
NOTE: Read all measurements; drawing is not proportional.
*Follow the instructions in FIGURES 16B and 16C, pages 26 and 27, to join a
Roof or Building Overhang
6” (152mm) minimum | Wall | 3 ft (1M) | |
| |||
12” | minimum | ||
|
| ||
( 305 mm) |
|
| |
|
| 6 ft (1.8M) minimum | |
|
| ||
|
|
| |
| Terminal Vent Pipe |
| Reznor (Option CC1) |
Vent Run |
|
| or Equivalent Vent Cap - |
|
| note positions of vent cap | |
(Comply | Pitch flue pipe down toward | openings (shaded areas) | |
with Re- |
| ||
quirements | outlet 1/4” per foot for con- |
| |
No. 1) & 2) | densate drainage. (NOTE: Slope | ||
on page 25.) | applies to entire horizontal vent run.) |
A clearance thimble is required when flue pipe extends through combustible materials. Follow the requirements of the thimble and/or the vent pipe manufacturer.
Parapet or Adjoining Building
FIGURE 19 - Vertical Vent Terminal
NOTE: Read all measurements; drawing is not proportional.
Building |
| |
Adjoiningor | 6 ft (1.8M) | |
| minimum | |
Parapet | ||
Terminal Vent Pipe* | ||
| ||
| Roof Flashing |
6” (152mm) minimum
*Follow the instructions in FIGURES 16B and 16C, pages 26 and 27, to join a double- wall vent terminal section to a
Reznor (Option CC1) or equivalent vent cap
Vertical flue extension must be 6” (152mm) higher than anticipated snow depth but no less than 2 ft (610mm) above the roof.
Roof - pitched from
0 to 45°
A clearance thimble is required when flue pipe extends through combustible materials. Follow the requirements of the thimble and/or the vent pipe manufacturer.
Vent Pipe (Comply with Requirements No. 1) and 2) on page 25.)