| FILE NO. | |
|
| |
|
|
|
No. Part name | Procedure | Remarks |
• Commonprocedure 1. Detachment
NOTE
Wear gloves for this job. Otherwise, you may injure your hands on the parts, etc.
1)Stop operation of the air conditioner, and turn off the main switch of the breaker for air conditioner.
2)Remove the valve cover. (screw 3 pcs.)
•After removing screw, remove the valve cover pulling it downward.
3)Remove cord clamp (screw 3 pcs.) and then remove connecting cable.
4)Remove the upper cabinet. (screw 5 pcs.)
•After removing screws, remove the upper cabinet pulling it upward.
2.Attachment
1)Attach the upper cabinet. (screw 5 pcs.)
2)Perform cabling of connecting cable, and attach the cord clamp.
∙ Fix the cord clamp by tightening the screws (screw 3 pcs.) fitting 2 concave parts of the cord clamp to each connecting cables.
3)Attach the valve cover.
(screw 3 pcs.)
∙Insert the upper part into the square hole of the side cabinet, set hook claws of the valve cover to square holes (at two positions) of the main unit, and attach it pushing upward,
– 101 –