FILE NO. SVM-10019

 

 

 

 

No.

Part name

Procedures

Remarks

 

 

 

 

Evaporator

7) Unscrew one screw which fix Electrical

 

 

(Heat exchanger)

Control Box and the casing. Move

 

 

 

Electrical Control Box until can see one

 

screw that fix Motor band and unscrew it then remove FIX-EVA-DN

Screw

Screw

Tighten the screw of Motor band,

 

assembly Electrical Control Box then

 

tighten screw to complete reassembly.

Motor band

Screw

Bearing base

1)

Follow to the procedure in the item .

 

2)

Remove the two screws used to secure

 

 

the bearing base.

Two screws

3) Remove the bearing base.

<Caution at assembling>

If the bearing is out from the housing, push it into the specified position and then incorporate it in the main body.

Bearing

Bearing base

– 97 –