CAUTION

Be sure to refer to the wiring system diagram labeled inside the front panel.

Check local electrical regulations for any specific wiring instructions or limitations.

Air inlet grille

FILE NO. SVM-10019

10-3-5. Piping and Drain Hose Installation

Piping and drain hose forming

Since condensation results in machine trouble, make sure to insulate both the connecting pipes separately.

(Use polyethylene foam as insulating material.)

Rear right

Front panel

2

1

3

 

 

Fig. 10-3-6

Rear left

Bottom left

Left

Bottom right

Right

cutting

 

Changing drain

preparation

panel slit

 

hose

Piping

 

 

 

 

Die- Front

 

 

 

 

 

 

Lock nut

Conduit pipe

 

Inter connecting

 

Fixing screw cable

Conduit mount

Fig. 10-3-7

Cord clamp

Terminal cover

Terminal block

 

 

Screw

L1 L2

S

L1 L2 S

 

 

Ground line

Screw

Connecting cable

Screw

Front panel

 

 

Fig. 10-3-8

 

4-5/16 in. (110 mm)

Ground

line

 

13/16 in. (20 mm)

 

 

 

S

L2

L1

3/8 in. (10 mm)

3-5/32 in. (80 mm)

Fig. 10-3-9

NOTE :

Use stranded wire only.

Wire type : minimum AWG14

Fig. 10-3-10

1.Die-cutting front panel slit

Cut out the slit on the left or right side of the front panel for the left or right connection and the slit on the bottom left or side of thefront panel for the bottom left or right connection with a pair of nippers.

2.Changing drain hose

For left connection, left-bottom connection and rear-left connection’s piping, it is necessary to relocate the drain hose and drain cap.

How to remove the drain cap

Clip drain cap with needle-nose pliers, and pull out.

Fig. 10-3-11

How to remove the drain hose

The drain hose is secured in place by a screw.

Remove the screw securing the drain hose, then pull out the drain hose.

Screw

Drain hose

 

Fig. 10-3-12

– 57 –