65
6 F 3 B 0 3 5 6
If the T-PDS is connected to the T2N/T3H on the second layer through the bridge station (T3H
only), set the T-PDS's connection method as follow.
-LP
S20T2N
-LP
S20T3H
-LP
S20T3H
S20LP
S20LP
STN #3STN #2 STN #1
T-PDS
STN #1
-LP
S20
STN #3STN #2
-LP
S20T2N
-LP
S20T2N
<T-PDS Setup options screen>
(Note 1) The Layer 1 Station No. specifies the bridge station and the Layer 2 Station No.
specifies the target station on the second layer.
(Note 2) Only T3H is available for the bridge station.
(Note 3) The Parity is fixed as even.