![](/images/new-backgrounds/1109477/10947715x1.webp)
Installation
Ensure that the power to all the devices you will be connecting is turned off. To prevent equipment damage caused by a ground potential difference, ensure that all devices on the installation are properly grounded.
Single-Station Installations:
A
1.Use the correct Tripp Lite KVM cable kits (as described in the Cables page 4), to connect a computer’s Keyboard, Video and Mouse ports to any available port on the KVM switch.
2.On a
16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 |
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| CPU |
8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 |
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.Plug the power adapter cable into the KVM’s power jack, then plug the power adapter plug into a UPS, surge or other AC power source.
4.Turn on the power to the computers.
Multiple Station (Daisy-Chained) Installation
To control even more computers, up to 31
Switches can be
Note: As many as 512 computers can be controlled from the unit’s integrat- |
|
ed console in a complete installation. Tables showing the relation between |
|
the number of computers and the number of KVMs needed to control them |
|
are provided in section A1in the Appendix. |
|
To set up a daisy-chained installation:
1.Ensure that power to all the devices to be connected has been turned off.
2.Use a
3.Use a KVM cable kit (described in Cables, page 4) to connect the Keyboard, Video and Mouse ports of a computer to any available port on the KVM switch.
4.Repeat the above steps for any additional
5.Power up the installation according to the following procedure:
a.Plug in the power adapter for the First Station. Wait a few seconds to allow the unit to determine its Station ID.
b. Plug in the power adapters for each subsequent Station in the installation in turn (ie. Second Station, then Third Station, etc.). Each
In each case, wait for the Station ID to be displayed on the Station ID LED before plugging in the next Station.
c. After all the Stations are up, power on the computers.
8