Completing the Installation
When the switch has been installed as specified above, then the unit can be configured as detailed below: -
1.Apply AC power to the switch. The green Power LED on the front panel should light.
2.Connect the Cat. 5/5e twisted pair cables from the network partner devices to the
3.If the fibre uplink is used, then connect the fibre link to the partner device (media converter, fibre NIC card or fibre switch etc). Verify that the green Link LED on the fibre module is lit which indicates that the optical link is valid.
4.If advanced modes such as
5.If legacy devices that do not support
6.Note that