Unified Brands HY-6G(CE) service manual Steam Port, Gasket, To Install, 30 OM/SM-HY-6GCE

Models: HY-6G(CE)

1 37
Download 37 pages 6.51 Kb
Page 30
Image 30

1.Turn off power to the steamer.

2.Unplug the two wires from the thermostat.

3.Using a wrench, remove the thermostat.

4.To install a new thermostat, use a small amount of heat sink compound (1 drop), applied to bottom of thermostat. Seat the thermostat on the steam port and connect.

5.Plug the thermostat into the wiring harness.

10.22 Steam Port

Gasket

P/N 096736

P/N 099250

1.Shut off power to the steamer.

2.Remove the 1-1/8 inch steam hose by loosening the clamp around the hose and sliding it away from the steam port. Turn and pull to loosen hose and remove from steam port.

3.With a wrench, remove the screws holding the thermostat to the steam port.

4.Cut and fold up aluminum foil insulation blanket to expose the two nuts which hold the steam port to the cavity wall threaded studs.

5.With a wrench, remove the two nuts.

6.Remove the steam port.

To Install:

7.Put a small bead of silicone sealant in and around the groove in the steam port to seal any possible leaks, or use gasket P/N 099250.

8.Install steam port on threaded studs. Secure with two nuts.

9.Fold down aluminum foil insulation blanket to original blanket position and repair cuts with aluminum foil duct tape.

10.Reinstall thermostat as described in 10.20 above.

11.Reinstall steam hose to steam port and install the clamp.

10.23Cavity Steam Hose Assemblies P/N 099953 (Top)

P/N 088880 (Bottom)

There are two hoses which connect the steam generators with their respective cavities. One for the top

cavity and one for the bottom cavity. If both hoses are to be replaced, replace them one at a time.

1.Shut off power to the steamer.

2.Remove cavity side and lower side panels of table.

3.In the upper portion of the steamer, remove hose. Turn and pull the hose to remove it from the hose nipple.

4.In the lower section of the steamer, remove the hose clamp from where the hose is connected to the steam generator. Turn and pull the hose to remove it from the hose nipple.

5.The hose may be removed. Be careful that the hose clamps do not fall off and get lost.

IMPORTANT: Make sure that the correct part (and part number) are being used. The two hoses in the steamer are of different lengths. (See Page 21 for Part Numbers.)

To Install:

6.Slide the two hose clamps onto the hose and position the hose adjacent to the steam port and steam generator.

7.Slide the hose onto the hose nipple on the steam port and at the other end, onto the steam generator nipple. Make sure the hose is on all the way so that the end of the hose is against the face of the nipples.

8.Install the hose clamps 3 mm (1/8") from the end of the hose.

10.24Door Removal/Installation/Alignment P/N 094150

1.To remove the door, turn off the steamer power and allow the steamer to cool. Then, remove door by supporting the weight of the door and remove hinge pin.

2.Place the door on a flat, clean table or similar support, with gasket facing up. Be careful not to scratch door surface.

3.Inspect door gasket for signs of cuts or other defects which may impair its function. Replace if necessary.

To Install:

4.To install the door, apply NEVER-SEEZ lubricant to hinge pin. Align door with hinge and insert hinge pin.