18.The wires for the alternate door switch may be foundunder the cavities. Connect the two wires from the switch to the wiring harness.
19.Close steamer door and operate steamer for six to eight minutes. If steamer fan does not operate, check location of door magnet and try operation again. If fan operation problem still exists, refer to the Troubleshooting Section of this Manual.
20.Allow steamer to operate for approximately 5 minutes, and then check for leaks. If there are no leaks then steamer is ready for operation. If there are leaks around the door, recheck door alignment, and if necessary, door gasket installation.
10.27Door Gasket P/N 094147
1.To install, turn off steamer, and allow to cool.
2.Remove the door hinge using one of the following two methods:
a)Support door weight and remove hinge pin, or
b)Support weight of the door and remove the two
3.Place the door on a flat, clean, smooth table or similar support. Be careful not to scratch the door
4.Position door on workbench so that its front is lying flat, with handle hanging over edge of bench.
5.Remove inner door panel.
6.Remove and discard gasket.
7.Clean back of the inner door panel. Be sure old sealant is completely removed.
8.Install new door gasket around inner door panel. Be sure the inner door panel flange is fully inserted into the door gasket groove.
9.Apply a high temperature silicone sealant, such as GE RTV 180 or equivalent, to the four door spacers.
10.Apply Locktite 242 to the inner door panel mounting screws.
11.Install inner door panel and door gasket on the door spacers, and tighten mounting screws.
12.Align door with hinge and insert hinge pin OR apply Locktite 242 to the
13. Align door to steamer, per Paragraph 10.24..
10.28Door Handle, Magnet and Block Assembly
Door Handle | P/N 070123 |
Magnet & Block | P/N 069762 |
Screws | P/N 005764 |
Door Cam | P/N 074252 |
P/N 094144 | |
Outer Door Panel | P/N 094140 |
Inner Door Panel | P/N 094141 |
Door Insulation Bd P/N 094192
1.Turn steamer off and allow it to cool.
2.Remove screws and
3.Remove screws securing handle, door handle, and cam.
4.Apply a
5.Assemble door cam to handle with screws.
6.Be sure door handle is in the DOWN position. Hold
7.Check operation of the cam and door spring. Push up on the door handle and check if spring opens. If the spring does not open, the cam and spring are not correctly aligned and the problem must be corrected.
8.Apply a light amount of Locktite 242 to screws, then install screws, securing
10.29Door Spring P/N 078911
1.Turn off steamer and allow it to cool.
2.With flat blade screwdriver, remove two screws on
3.Carefully remove retaining ring from one end of spring support pin, then remove the pin by moving the pin to the left and to the right.
4.With a wrench, remove the nut. Lift the spring retainer, and then remove the spring.
To Install:
5.Apply a high temperature (rated 250ºC)