United States Stove 1600M Distribution Blower Installation, Shaker Grate Handle Installation

Models: 1600M

1 20
Download 20 pages 63.5 Kb
Page 8
Image 8
DISTRIBUTION BLOWER INSTALLATION

DISTRIBUTION BLOWER INSTALLATION

Distribution blower slides onto rear of furnace.

Engage blower flange with channels and press down.

SHAKER GRATE HANDLE INSTALLATION

1.Attach angle with two 1/4" x 3/4" hex bolts and two 1/4" lock nuts.

2.Attach handle with 1/4" x 1" hex bolt and 1/4" lock nut.

3.Put brass knob onto end of handle.

SMOKE DOOR INSTALLATION

SMOKE DOOR CLIPS

1/4" LOCK NUTS

1/4" X 1-1/4"

CARRIAGE BOLTS

FRONT

OF

FURNACE

SMOKE DOOR

FUEL

LOADING

DOOR

FRAME

1

INSTALLING ASH DOOR SPIN DRAFT

1. Screw spin draft onto 3/8" x 2-1/2" carriage bolt.

2. Screw spin draft and bolt assembly into ash door allowing approximately 1/2" of the bolt to extend beyond the inside of the door.

3. Secure bolt in place with 3/8-16" locking nut.

2

SPIN DRAFT CAP

3/8-16 x 2-1/2"

CARRIAGE

BOLT

3

3/8-16" LOCK NUT

8

Page 8
Image 8
United States Stove 1600M Distribution Blower Installation, Shaker Grate Handle Installation, Smoke Door Installation