DISTRIBUTION BLOWER INSTALLATION
Distribution blower slides onto rear of furnace.
Engage blower flange with channels and press down.
SHAKER GRATE HANDLE INSTALLATION
1.Attach angle with two 1/4" x 3/4" hex bolts and two 1/4" lock nuts.
2.Attach handle with 1/4" x 1" hex bolt and 1/4" lock nut.
3.Put brass knob onto end of handle.
SMOKE DOOR INSTALLATION
SMOKE DOOR CLIPS
1/4" LOCK NUTS
1/4" X
CARRIAGE BOLTS
FRONT
OF
FURNACE
SMOKE DOOR
FUEL
LOADING
DOOR
FRAME
1
INSTALLING ASH DOOR SPIN DRAFT
1. Screw spin draft onto 3/8" x
2. Screw spin draft and bolt assembly into ash door allowing approximately 1/2" of the bolt to extend beyond the inside of the door.
3. Secure bolt in place with
2
SPIN DRAFT CAP
CARRIAGE
BOLT
3
8