®
VDDVF36PN/PP and VDDVF36STN/STP Series
VENTING INSTALLATION
Continued
Horizontal Termination
Configurations
Figures 21 through 23 show different con- figurations for venting with horizontal ter- mination. Each figure includes a chart with vertical minimum/maximum and horizon- tal maximum dimensions which must be met. All connections must be sealed with high temperature silicone sealant as speci- fied in the second warning statement on
Horizontal Venting
Vertical (V) | Horizontal (H) |
49.5" min. | 15" max. |
(45° elbow, 1' vertical pipe, 90° elbow)
61.5" min. | 34" max. |
73.5" min. | 58" max. |
85.5" min. | 10' max. |
102.5" min. | 20' max. |
UP
45° Starter
Elbow
Required
Note: The 30° Starter Elbow Must Be Discarded and Replaced with a 45° Starter Elbow.
page 7. All horizontal terminations require 1/4" rise per 12" of horizontal run.
Figure 21 - Horizontal Termination Configuration for Rigid Venting Using One 90° Elbow
Horizontal Venting
See information in Figure 21 for
Vertical(V) and UP Horizontal(H) maxi-
mums and minimums. The same amounts apply for flexible venting.
FGFVK Vent Kit Shown
Figure 22 - Horizontal Termination Using Flexible Venting
10 | 106918 |