OWNER’S MANUAL
PRE-INSTALLATION
PREPARATION
Continued | 1" (25mm) |
Dia. Hole |
GENERAL VENTING
These models are approved for use with Simpson
" /8
(600mm)5 23
40 |
|
|
|
| Min. | ||
(1029mm) | |||
| / | 39 3/4" | |
| 2" | (1010mm) | |
|
|
Figure 7 - Rough Opening for Installing Peninsula Fireplace
|
| (25mm) |
|
| 1" |
|
| 3" |
2" (51mm) |
| (76mm) |
Dia. Hole | (51mm) |
|
|
| |
| 2" |
|
|
| 3" (76mm) |
Figure 10 - Hole Locations For Gas Line and Electric Wires for Peninsula and See Thru Fireplaces
10"
(254mm) Square Min.
Your fireplace is approved to be vented either through the side wall, or vertically using the following guidelines:
• | Only use Vanguard or Simpson Dura- |
| Vent GS venting components or kits spe- |
| cifically approved for this fireplace. |
• Minimum clearance between vent pipes | |
| and combustible materials is 1" (25 mm), |
| except where stated otherwise. |
• Combustible material may be flush with | |
| the top front of fireplace with a maxi- |
| mum thickness of 3/4". |
• | Do not recess venting terminals into a |
| wall or siding. |
• | Install horizontal venting with a 1/4" |
| rise for every 12" of run toward the ter- |
| mination. |
Platform Must Be |
|
Solid, Flat, and | " |
| 8 |
Fully Supported | 5/ |
23 | |
| (600mm) |
| 39 3/4" |
| (1010mm) |
| Min. |
Height
Depends On
Installation
Figure 11 - Rough Opening for Installing Exterior Vent Terminal
• You may paint the vent terminal with |
450°F (232°C) |
ordinate with the exterior finish. |
• There must not be any obstruction such |
as bushes, garden sheds, fences, decks, |
or utility buildings within 24" from the |
front of the termination cap. |
• Do not locate termination cap where ex- |
40 / |
2" |
(1029mm) |
* |
Figure 8 - Rough Opening for Installing Peninsula Fireplace on Platform
* As required by design as long as ceiling clearance is maintained.
Vertical Height
Depends on
Installation
90o Elbow
45o
Elbow
263/8"
(670mm)
Refer to Pages 8 through 14 for Horizontal and Vertical Installation Details
cessive snow or ice build up may occur. |
Be sure to clear vent termination area af- |
ter snow falls to prevent accidental block- |
age of venting system. When using snow |
blowers, do not direct snow towards vent |
termination area. |
LOCATION OF VENT
TERMINATION
When locating vent termination, it is impor- tant to observe the minimum clearances shown in Figure 13, page 6. You will avoid extra framing by positioning your fireplace against an already existing framing mem-
" |
|
|
5/8 |
|
|
(600mm) |
|
|
39 3/4" | ||
23 |
|
|
(1010mm)
Min.
43 (1098mm)/4"
Figure 9 - Rough Opening for Installing See Thru Fireplace
Horizontal
Length Depends
on Installation
Figure 12 - Vent Opening Height
ber. The sides of the fireplace may be posi- tioned directly against combustible walls.
*Check with local codes or with the current CAN/CGA B149[.1 or .2] Installation Codes for Canada or the USA Installations follow the current National Fuel Gas Code, ANS Z223.1, also known as NFPA 54.
Continued
105706 | 5 |