Vermont Casting DVHVAC36 manual Typical Ceil

Models: DVHVAC36

1 32
Download 32 pages 10.27 Kb
Page 18
Image 18

DVHVAC36

 

 

Max 8'

 

 

(2.4 m)

 

 

45°

Typical Ceil-

 

40'

ing Support

 

Application

 

(12 m)

 

 

Max 8'

 

 

(2.4 m)

 

 

45°

 

 

 

Typcal Roof

 

 

Support Ap-

 

 

plication

Fig. 31

Typical vertical roof application.

 

5.Place fireplace into position.

6.Place firestop(s) #7DVFS or attic insulation shield #7DVAIS into position and secure. (Fig. 32)

7.Install roof support (Fig. 33) and roof flashing, mak- ing sure upper flange is below the shingles. (Fig. 33)

8.Install appropriate pipe sections until the venting is above the flashing. (Fig. 33)

9.Install storm collar and seal around pipe.

10.Add additional vent lengths for proper height. (Fig. 34)

11.Apply high temperature sealant to 4" and 7" collars of vertical vent termination and install.

If there is a room above ceiling level, firestop spacers must be installed on both the bottom and the top side of the ceiling joists. If an attic is above ceiling level a 7DVAIS (Attic Insulation Shield) must be installed. (Fig. 32)

The enlarged ends of the vent section al- ways face downward. (Fig. 33)

Attic Insulation

Shield

Joist

 

 

11"

 

Ceiling In-

11"

Upper Floor

 

 

 

stallation

 

 

 

 

 

Joist

 

 

 

Firestop Spacer

 

 

Nails (4)

CFM100

 

 

 

Fig. 32 Place firestop spacer(s) and secure.

3 #5 Sheet Metal

Screws per Joint

Sealant

Storm Collar

TWL101a

Fig. 33 Roof flashing.

Vent Termination

 

2'

Storm Collar

 

(610mm)

 

Min.

 

 

Roof Support

Roof Flashing

 

 

40'

Attic Insulation

 

Shield

 

(12.m)

Attic Insula-

 

 

tion

 

 

Joists

 

 

 

Joists

FP1022

Fig. 34 Typical straight-up installation.

18

10001195

Page 18
Image 18
Vermont Casting DVHVAC36 manual Typical Ceil