Models: 1GR35M ML-136407, 1GR45M ML-136408, 1GR65M ML-136409, 1GR85M ML-136410, 2GR45MF ML-136417, 2GR65MF ML-136418, 2GR85MF ML-136419, 3GR45MF ML-136420, 3GR65MF ML-136421, 3GR85MF ML-136422, 4GR45MF ML-136423 1GR35M, 1GR45M, 1GR65M, 1GR85M, 2GR45MF, 2GR65MR, 2GR85MF, 3GR45MF, 3GR65MF, 3GR85MF, 4GR45MF, ML-136407, ML-136408, ML-136409, ML-136410, ML-136417, ML-136418, ML-136419, ML-136420, ML-136421, ML-136422, ML-136423

1 20
Download 20 pages 21.72 Kb
Page 7
Image 7
INSTALLATION

GR SERIES GAS FRYERS

INSTALLATION

WARNING: THIS EQUIPMENT SHALL BE INSTALLED ONLY BY A LICENSED GAS FITTER.

Caution: Do not use the door or its handle to lift the fryer.

Before installing the fryer, verify that the type of gas (natural or propane) agrees with the specifications on the fryer data plate, which is located on the inside of the door panel. Make sure the fryer is configured for the proper elevation.

Record your fryer model, device, and serial numbers for future reference in the space provided below. This information can be found on the fryer data plate.

Fryer Model No.: ______________________

Device: ______________________________

Serial No.: ____________________________

TOOLS NEEDED FOR INSTALLATION

Standard set of plumbing and hand tools.

AC current tester.

Gas pressure test gauge.

REQUIREMENTS FOR INSTALLATION

Electrical

Voltage – 120 AC (or 240 AC optional) Voltage is required for KleenScreen™ only. No Voltage for GR Free Standing Fryers.

Amps – 15 Amps Frequency – 50/60 Hz

Gas Supply Pressure

Natural – 0.80 kPa (4" W.C.)

Propane – 2.75 kPa (10" W.C.)

WARNING: IF INCOMING PRESSURE EXCEEDS 3.45 kPa (14" W.C., 1/2" PSI), AN ADDITIONAL PRESSURE REGULATOR MUST BE INSTALLED.

Checking the Gas Supply Pressure

Caution: The fuel supply system must be tested before the fryer is used.

If the fuel line is going to be tested at a pressure greater than 1/2 psig (3.45 kPa), make sure that the fryer is disconnected from the fuel line. If the fuel line is to be tested at a pressure equal to or less than 1/2 psig (3.45 kPa), the fryer can be connected but the unit’s gas valve must be closed.

Clearances

Minimum clearance from combustible construction:

6" (15 cm) from the sides of the fryer 6" (15 cm) from the back of the fryer

The fryer may be installed on combustible floors.

Minimum clearance from noncombustible construction:

0" from the sides of the fryer 0" from the back of the fryer.

Between the fryer and any open-top flame units:

at least 16" (41 cm)

Allow space for servicing and operation, such as opening the rear door to set temperature and light the pilot.