Vulcan-Hart FK36_A Installation,Operation and Care Of HEAVY DUTY SECTIONAL GAS RANGES, Unpacking

Models: FK FK36_A

1 36
Download 36 pages 31.48 Kb
Page 4
Image 4
Installation,Operation and Care Of

Installation,PLEASE KEEP THIS MANUAL FOR FUTURE REFERENCEINSTALLATIONOperation and Care Of

HEAVYUNPACKINGLOCATION DUTY SECTIONAL GAS RANGES

PLEASEManual backgroundManual backgroundManual background KEEP THIS MANUAL FORManual backgroundManual background FUTUREManual backgroundManual backgroundManual backgroundManual backgroundManual background REFERENCEManual backgroundManual backgroundManual background

GENERAL

Heavy duty sectional ranges are produced with quality workmanship and material. Proper installation, usage and maintenance of your range will result in many years of satisfactory performance.

The manufacturer suggests that you thoroughly read this entire manual and carefully follow all of the instructions provided.

INSTALLATIONManual background

UNPACKING

This range was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage. If the range is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.

Carefully unpack range(s) and place in the approximate installation position, whether as a battery or single stand-alone range.

Remove parts (packed in a cardboard box) from oven cavity, or cabinet body, or on top of modular range(s).

Remove wire or nut from rear of each burner before installing the range.

Before installing, check the electrical service (Convection Oven Models only) and type of gas supply (natural or propane) to make sure they agree with the speci￿cations on the rating plate located on the inside of the burner box lower panel. The rating plate will show the voltage, phase, cycle, full load ampere, BTU, as well as the type of gas. If the supply and equipment requirements do not agree, do not proceed with the installation. Contact your dealer or manufacturer.

LOCATION

CAUTION: The equipment area must be kept free and clear of combustible substances.

The minimum installation clearances from combustible and noncombustible construction for ranges using inputs of 30,000 BTU/Hr. per open top burner are:

 

Combustible

Noncombustible

Sides

20" (508 mm)

0"

Rear

2" (51 mm)

0"

4

Page 4
Image 4
Vulcan-Hart FK36_A manual Installation,Operation and Care Of HEAVY DUTY SECTIONAL GAS RANGES, Unpacking, Location