27. Wrap the Butterfly Cable (50) under a 90mm

27

 

Pulley (48). Attach the Pulley and two Half

 

 

 

Guards (55) to the Double “U”-bracket (61) with

 

 

an M10 x 50mm Bolt (97) and an M10 Nylon

 

 

Locknut (77). Make sure the Half Guards are

 

 

oriented as shown.

 

 

 

50

77

 

48

 

 

 

97

55

 

55

61

28. Wrap the Butterfly Cable (50) over a “V”-pulley

28

 

(47). Attach the “V”-pulley, a Long Cable Trap

 

79

 

(57), an M10 Washer (80), and two Guards (54)

54

 

to the Right Upright (2) with an M10 x 63mm

 

 

57

Bolt (79) and an M10 Nylon Locknut (77).

 

 

50

 

 

 

47 80

 

 

54

 

 

 

2

 

 

77

29. Grease an M8 x 22mm Shoulder Bolt (90).

29

 

Attach the Butterfly Cable (50) to the Right

 

 

 

Butterfly Bracket (29) with the Shoulder Bolt

Grease

90

and an M8 Nylon Locknut (78). Make sure the

 

50

flat edge of the Cable is against the Butterfly

78

 

Bracket.

 

 

 

29

 

 

 

Flat Edge

 

17

 

Page 17
Image 17
Weider 831.14623.0 user manual Locknut 77. Make sure the Half Guards are Oriented as shown