20.Wrap the Long Cable (80) under a 90mm Pulley
(28)as shown. Attach the Pulley and a Pulley
Guard (29) to the Upright (3) with an M10 x 113mm Button Head Bolt (40) and an M10 Nylon Locknut (76). Be sure the fiat edge of the Pulley Guard is on the bottom.
2O
80
Flat
Edge
21.Attach a Pulley Housing (94) to the indicated "U'- channel on the
(76).
Wrap the Long Cable (80) around a 90mm Pulley (28). Attach the Pulley inside of the Pulley Housing (94) with an M10 x 42mm Button Head Bolt (71) and an M10 Nylon Locknut (76).
22. Wrap the Long Cable (80) around a 90mm Pulley |
(28). Attach the Pulley and a Pulley Guard (29) to |
the indicated M10 x 140mm Carriage Bolt (73) |
with an M10 Nylon Locknut(76). Be sure the fiat |
edge of the Pulley Guard is on the side |
shown. |
23. Make sure there are no Crossbows (not shown) |
under the |
Crossbow (not shown). Have a second person |
pull on the Long Cable (80) to create slack in the |
21
71
28
22
28
80
Edge
Cable. |
Insert the end of the Long Cable (80) through the |
welded tube on the indicatedend of the Cross |
Tube (11) and then through the remaining Swivel |
Arm (22). Be sure the Cable is on the indicated |
side of the welded rod in the Swivel Arm. |
Insert the Swivel Arm (22) into the welded tube |
on the Cross Tube (11). Secure the Swivel Arm |
with an M4 x 5mm Screw (104). |
Wrap the Long Cable (80) around a 90mm Pulley |
(28). Attach the Pulley inside of the Swivel Arm |
(22) with an M10 x 42mm Button Head Bolt (71) |
and an M10 Nylon Locknut (76). |
23
80..
28
71
22
76
11