UPPER CABLE ADJUSTMENT

After completing the assembly of the resistance system, the tension on the Upper Cable (121) will need to be adjusted. Also, the Upper Cable can stretch slightly when it is first used. When this occurs, the upper cable ten- sion will need to be readjusted. Follow the steps below to adjust the upper cable tension.

1. Connect the two Tension Gauges (115, 116) 1 together using the magnet.

 

 

115

Magnet

 

 

 

 

 

 

 

 

 

116

 

 

 

2. Plug in the resistance system as described in

2

10

 

 

 

PLUGGING IN THE RESISTANCE SYSTEM on

 

 

 

page 16. Use the Console (not shown) to adjust

 

115

 

 

 

the resistance setting of the system to the highest

 

121

 

 

setting, as described in Select a resistance set-

 

 

 

 

ting on page 16.

 

 

 

 

 

Squeeze the Upper Cable (121) together near a

 

 

 

 

 

Large Pulley (14). Hook the ends of the Tension

 

 

 

 

 

Gauges (115, 116) around the Upper Cable as

 

116

 

 

 

shown. Do not hook the ends of the Tension

14

70

 

 

Gauges around the Tether (70), which is

 

 

 

attached to the back of the Pulley Bracket

 

121

 

 

115

(10).

 

 

 

Slide the Tension Gauges (115, 116) next to the

 

 

14

116

121

Large Pulley (14) as shown in the inset drawing.

3

 

3. Locate the 3/8” x 38mm Tension Screw (114) on

 

9

 

 

each end of the Resistance Bar (9). Alternately

 

 

 

 

tighten each Screw one turn at a time until the

114

 

 

 

 

two Tension Gauges (115, 116) are pulled apart

 

 

 

 

by the Upper Cable (121).

 

 

115

 

 

The upper cable tension is now properly adjusted.

 

 

 

 

 

 

 

116

 

 

 

 

 

121

 

 

12

Page 12
Image 12
Weider WESY75742 user manual Upper Cable Adjustment