Manuals
/
Yeoman
/
Household Appliance
/
Boiler
Yeoman
YM-CL8HB manual Tel 01392 474500 Fax
Models:
YM-CL8HB
1
39
39
Download
39 pages
33.29 Kb
32
33
34
35
36
37
38
39
<
>
Troubleshooting
Specification
Install
Parts list
Pipe work Diagrams
Dimension
Maintenance
Problem
7.3To adjust the door hinge plate assembly
Checklist
Page 39
Image 39
A division of Stovax Ltd
Falcon Road, Sowton Industrial Estate, Exeter, Devon, England EX2 7LF
Tel: (01392) 474500 Fax: (01392) 219932
E-mail:
yeoman@stovax.com
www.yeoman-stoves.co.uk
Page 38
Page 39
Image 39
Page 38
Contents
High Output Boiler Stove
YM-CL8HB
Instructions for Use Installation and Servicing
Yeoman CL
PRE-INSTALLATION
CONTENTS
APPLIANCE COMMISSIONING CHECKLIST
INSTALLATION INSTRUCTIONS
Essential Information - MUST be completed
APPLIANCE COMMISSIONING CHECKLIST
Installation Engineer
Retailer appliance was purchased from
THERMOSTAT
USER INSTRUCTIONS
1.General POINTS
SERIAL NUMBER
CONTROLS, GENERAL
SAFETY CONTROLS
HEATING SYSTEM controls
DOOR OPERATION
SEASONAL USE
2.USING THE Appliance FOR THE FIRST TIME
CONDENSATION
NORMAL RUNNING
3.3Fuel consumption
4.Lighting the Appliance
USER INSTRUCTIONS
3.2Solid fuel
Close the doors immediately after refuelling
5. Running The appliance
USER INSTRUCTIONS
Burning wood
USER INSTRUCTIONS
REFUELLING
THERMOSTAT OPERATION
6.Burning tips
6.5Weather conditions
7.ASH REMOVAL
Problem
USER INSTRUCTIONS
USER INSTRUCTIONS
8.Wood burning tray
9.Extended burning
10.OVER-FIRING
14.CHIMNEY SWEEPING
12.GENERAL CLEANING
13. CLEANING GLASS
11.Chimney fire
3.Stove operated at too low a temperature
17.Troubleshooting tips
15. Care of stove
16.Seasonal use
USER INSTRUCTIONS
17.5All or some of the radiators do not get hot
Open up the airwash to make
Model
TECHNICAL SPECIFICATION
1.STANDARD FEATURES
Boiler Output Chart
TECHNICAL SPECIFICATION
YEOMAN DIMENSIONS
In the U.K
SITE REQUIREMENTS
1.FLUE OR CHIMNEY
Max. Draught = 2.0mm Wg Min. Draught = 1.0mm Wg
1. HEARTH DIMENSIONS
1. FLUE OUTLET POSITIONS
SITE REQUIREMENTS
Distance of Appliance to wall
WALLS NEXT TO A HEARTH
SITE REQUIREMENTS
Requirement for the walls
Yeoman YM-CL8HB
PRE-INSTALLATIONCHECKS
1. Flue
Model
2. VENTILATION
PRE-INSTALLATIONCHECKS
Model
1.2Top flue pipe installation
INSTALLATION INSTRUCTIONS
1. INSTALLING THE Appliance
Legal requirements
Do not use a 90˚elbow to make this connection
2. REMOVAL OF THE LOG GUARD
INSTALLATION INSTRUCTIONS
1.3Rear flue pipe installation
Do not modify the baffle
3.FITTING AND REMOVAL OF THE BAFFLE
4.REMOVAL OF RIDDLING MECHANISM
INSTALLATION INSTRUCTIONS
Lift bars to remove
INSTALLATION INSTRUCTIONS
Top Flue
5.HEARTH FIXING
6. CAST TOP
INSTALLATION INSTRUCTIONS
4.Open Vent And Cold Feed System
CENTRAL HEATING SYSTEM 1. General
2.Boiler Sizing
3.Hot Water Cylinder
CONVENTIONAL Pipe work systems
12.Pipe work Diagrams
6.Pump
7.Electrical Supply
Feed and Expansion Cistern
INSTALLATION INSTRUCTIONS
CONDENSATION
Heating system controls
LINK UP SYSTEMS
CONTROLS GENERAL
Appliance Commissioning Checklist page
COMMISSIONING
BALANCING THE SYSTEM
Recorddealer/supplier and installer details in
Glass cleaning
MAINTENANCE and SERVICING
1.ANNUAL SERVICE
Do not use acidic cleaners on printed glass
MAINTENANCE and SERVICING
2.REMOVAL OF THE LOG GUARD
3.FITTING AND REMOVAL OF BAFFLE
5.FITTING A NEW DOOR GLASS
MAINTENANCE and SERVICING
6.Fitting a new door seal
HETAS Approved Chimney Sweeps
7.ADJUSTING DOOR CATCH & HINGES
MAINTENANCE and SERVICING
7.3To adjust the door hinge plate assembly
SPARE PARTS LIST
Product
SPARE PARTS LIST
5TH SERVICE
SERVICE RECORDS
1ST SERVICE
3RD SERVICE
Tel 01392 474500 Fax