PART 3 - EXECUTION

3.01INSTALLATION

A.General: Rig and Install in full accordance with Manufacturers requirements, Project drawings, and Contract documents.

B.Location: Locate condensing unit as indicated on drawings, including cleaning and service maintenance clearance per Manufacturer instruc- tions. Adjust and level condensing unit on support structure.

C.Components: Installing Contractor shall provide and install all auxiliary devices and accessories for fully operational condensing unit.

D.Electrical: Coordinate electrical requirements and connections for all power feeds with Electrical Con- tractor (Division 16).

E.Controls: Coordinate all control requirements and connections with Controls Contractor.

F.Finish: Installing Contractor shall paint damaged and abraded factory finish with touch-up paint matching factory finish.