Zebra Technologies zebra p330 user manual Take-up Spool Flange Supply Spool

Models: zebra p330

1 66
Download 66 pages 57.22 Kb
Page 24
Image 24

Installation and Setup

Loading a Ribbon

Ribbon Take-up

Ribbon Supply

Spindle

Spindle

3.Locate the Ribbon Supply Spindle and the Ribbon Take-up Spindle (see above). Load ribbon onto the supply spindle (under the print head carriage) flange side in, and load the empty core (with tape attached) onto the take-up spindle. Make sure the ribbon comes off the top of the supply spindle and feeds to the top of the take-up spindle.

Take-up

Spool

Flange

Supply Spool

12

P330i User’s Manual

980459-001 Rev. A

Page 24
Image 24
Zebra Technologies zebra p330 user manual Take-up Spool Flange Supply Spool