English
6. Set up
SE1
[BCZ3001S]
(1)
[BCZ3001SW]
IMPORTANT
Tighten the screws gradually by turns.
■INSTALLING HANDLE
•Mount the handle to the shaft tube and clamp it at a location that is comfortable to you. (SE1)
(1)About 19 inches (48cm)
(2)About 14.5 inches (37cm)
■HIP PAD
• Fix the tube by the band. (SE2)
SE2
(1)
SE3 |
|
| |
| (1) | (2) | |
|
| ||
[BCZ3001S] | [BCZ3001SW] |
| |
|
| ||
| |||
SE4 |
|
|
SE5
(1) Band
■INSTALLING CUTTING ATTACHMENT GUARD
•Put the cutting attachment guard on the braket, attach it with the 2 screws. (SE3)
IMPORTANT
2 kinds of cutting attachment guard are packed in with
(1)Guard for Line Head (Red) :
(2)Guard for Blade (Black) :
■INSTALLING LINE HEAD (SE4)
1.While locking the gear shaft, by inserting the supplied tool into the upper holder on the gear box, loosen and remove the hexagon
2.Fit the line head assembly to the gear shaft over the holders.
IMPORTANT
You need not holder (B) and nut when installing the line head.
■BALANCE UNIT
1.Put on strap and attach unit to strap.
2.Slide clamp up or down until unit balances with head just touching on the ground. (SE5)
20