GASBOY Series 70 & 1820
NOTE: | Tubing can be piped to any available opening on top of tank. Use reducer bushings |
| as required. |
Testing the Vacuum Breaker
1.Charge tubing completely with fluid.
2.Turn on pump and run for several minutes to purge any air from the system.
3.Turn off pump.
4.With nozzle at ground level and discharging into a container, open nozzle. A small quantity of fluid (several cups) should drain and then stop.
9312 |