Raypak P-R185B to R-P405B, C-R185B to C-R405B, P-R185BL to P-R405BL, C-R185BL to C-R405BL, RP2100

Page 13

INDOOR HEATER INSTALLATION

The design is also certified for indoor installation when equipped with the approved draft hood.

For Canada, indoor installation is restricted to an enclosure that is not occupied and does not directly communicate with occupied area. Refer to the latest edition of CAN/CGA-B149.1 and B149.2 for specific requirements.

Locate heater as close as practical to a chimney or gas vent. Heater must always be vented to the outside. See Vent Piping section (pg. 17) for venting details. Minimum allowable space is shown on the nameplate.

WARNING: Indoor boilers require a drafthood that must be connected to a vent pipe and properly vented to the outside. Failure to follow this procedure can cause fire or fatal carbon monoxide poisoning.

OUTDOOR STACK / INDOOR STACK INSTALLATION

NOTE: The outdoor and indoor stack are optional equipment and do not come standard with the heater.

OUTDOOR KIT INCLUDES:

1- Draft hood, painted

1- Adapter plate

3- Mounting brackets (clips)

1- Top panel cover

2- 1 foot sections of metal tape

3- Screws

1- InstructionsClips

INDOOR KIT INCLUDES:

1- Draft hood, unpainted

1- Adapter plate

3- Mounting brackets (clips)

3- Screws

1- Instructions

Clips

 

OUTDOORSTACK

INDOORSTACK

Model

Part No.

Part No.

185

006751

006696

265

006752

006697

335

006753

006698

405

006754

006699

ASSEMBLY PROCEDURE

1.Make sure that the gas and electricity to the unit has been turned off.

2.Remove the "pagoda" top from the louvered top and discard. See Fig. 3.

3.Remove the louvered top and set aside, saving the four phillips screws for reassembly. See Fig. 3.

4.Remove and discard the rain shield. See Fig. 4.

5Install adapter plate on top of heater flue collector. See Fig. 5.

6.Reinstall louvered top on heater and fasten with Phillips screws set aside in step 3.

13

Image 13
Contents What to do if YOU Smell GAS Installation and Operating InstructionsPage Contents For Your Safety Read Before Operating START-UP ProceduresBefore START-UP Burners Water Lighting Instructions Millivolt SystemTo Turn OFF GAS to Appliance What to do if YOU Smell GAS Electronic Ignitions SystemsOperating Instructions Water Pressure Switch Maintenance and Care ProceduresAfter START-UP Visual InspectionAutomatic Chlorinators Chemical Feeders Pool & SPA Water ChemistryCold Weather Operation Winterizing the Pool & SPA Heater Receiving Equipment General Specifications Standardunitpolymerheaders Asme Unit Cast Iron Headers Installation Instructions Installations only OutdoorheaterinstallationOutdoor KIT Includes Indoor Heater InstallationIndoor KIT Includes Securing the TOP Panel Cover Indoor KIT only Installing the Clips Indoor & Outdoor KitsSecuring the TOP Panel Cover Outdoor KIT only Installing the TOP Cover Outdoor KIT only Combustion and Ventilation AIR Indoor Units Only Specifications and DimensionsGAS Supply Connections Vent PipingGAS Pressure Regulator GAS Pressure Adjustment LocationsPipe Sizing for GAS Connections Flow Rates Plumbing for Water ConnectionsUnitherm Governor Operation Cast Iron Headrers Asme ModelsAuxiliary Bypass Valve Adjustment External Auxiliary Bypass Valve Where RequiredHeat Exchanger Pressure Drop Tables For Asme Models call your factory representative Heat Exchanger Reversal Procedure Polymer Header ModelsMillivolt System Electrical WiringElectronic 240V Wiring Transformer Wiring 120V WiringIndependently Wiring Diagram Millivolt Mechanical Thermostat Wiring Diagram IID Atmospheric Wiring Diagram IID Low NOx Control Panel Removal General Location of Controlscontrol AdjustmentsMillivolt Controls Thermostat Control Operation Digital Thermostat ControlsFahrenheit vs Centigrade Reading a Fault DiagnosticsDisplay Definition Remote Operation Remote Control Installation and OperationActivating the Remote Wire Remote Control On-Off Remote Control WiringFlame ROLL-OUT Safety Switch Pressure SwitchPilot SAFETY- Millivolt Pilot SAFETY- ElectronicBurner Drawer Removal Pilot Removal and CleaningGAS Valve Removal Main Burner and Orifice RemovalDesootingprocedure TubecleaningprocedureImmersion Well Replacement Unitherm Governor U.G. ReplacementBurneradjustment START-UP ProceduresBlower Adjustment Flame ROLL-OUT Safety SwitchCombustion FAN Removal Pilot RemovalMechanicalforqualifiedservicepersonnelonly Troubleshooting GuideRaypak Pool or SPA Heater Electrical Check with MV GAS Valve Electrical Standing Pilot MillivoltFor qualified technicians only Electrical Electronic Ignition IID TroubleshootingDigital Control Logic Flow Chart RAYPAK, INC Replacement PartsEastman Avenue Oxnard, CA For Canada Illustrated Parts List Pilot Assemblies Page Page Page Page Page
Related manuals
Manual 46 pages 34.19 Kb