Raypak RP2100 operating instructions Cast Iron Headrers Asme Models, Unitherm Governor Operation

Page 20

CAST IRON HEADRERS (ASME MODELS)

Heater must be located so that any water leaks will not damage the structure of adjacent area. High temperature 2" plastic pipe (CPVC) may be threaded directly into the header flanges. This is not the same as the Schedule 80 PVC pipe which is also colored gray. PVC may be used immediately after the CPVC adapters.

2" CPVC Adapters

INLET/OUTLET HEADER - ASME

Flange Gasket

Fig. # 8093.1

Header Flange

ASME

 

Inlet/Outlet Header

PVC Pipe

 

CAUTION: NEVER install PVC directly into header flanges. Use the 2" CPVC adapter supplied loose with the heater.

DO NOT use petroleum base assembly fluids (such as Petroleum Jelly or lubricating oil). If assembly lube is required, use a silicon base such as Amoral etc.

There are two sets of flange gaskets supplied with your heater. Use the appropriate gaskets for all your heater connections. Discard unused set.

GASKET DESIGN #1: Accepts 1-1/2" copper tube or 1-1/4" galvanized pipe as a slip connection.

GASKET DESIGN #2: Accepts 2" copper tube as a slip connection. The flange is threaded for 2" screw in pipe connections. Also used with the 2" CPVC adapters.

#1#2

UNITHERM GOVERNOR OPERATION

CAUTION:

The patented Unitherm Governor is a thermostatic mixing valve specifically designed to maintain constant heater internal temperature between 105° to 115°F despite continually changing flow rates from the filter and changing pool temperatures. This narrow range is needed to prevent damaging condensation on the burners which will occur if the heater runs for any length of time below 100°F. It is also needed to inhibit scale formation in the tubes by maintaining temperatures well below accelerated scaling temperatures.

U.G. PLUG (Polymer)

UNITHERM

Fig. # 8095.1

Fig. # 8097.1

GOVERNOR

 

 

GASKET

20

Image 20
Contents Installation and Operating Instructions What to do if YOU Smell GASPage Contents Before START-UP Burners Water START-UP ProceduresFor Your Safety Read Before Operating To Turn OFF GAS to Appliance Millivolt SystemLighting Instructions Operating Instructions Electronic Ignitions SystemsWhat to do if YOU Smell GAS Maintenance and Care Procedures Water Pressure SwitchAfter START-UP Visual InspectionCold Weather Operation Pool & SPA Water ChemistryAutomatic Chlorinators Chemical Feeders Winterizing the Pool & SPA Heater Standardunitpolymerheaders Asme Unit Cast Iron Headers General SpecificationsReceiving Equipment Installation Instructions Outdoorheaterinstallation Installations onlyIndoor KIT Includes Indoor Heater InstallationOutdoor KIT Includes Securing the TOP Panel Cover Outdoor KIT only Installing the Clips Indoor & Outdoor KitsSecuring the TOP Panel Cover Indoor KIT only Installing the TOP Cover Outdoor KIT only Specifications and Dimensions Combustion and Ventilation AIR Indoor Units OnlyVent Piping GAS Supply ConnectionsPipe Sizing for GAS Connections GAS Pressure Adjustment LocationsGAS Pressure Regulator Plumbing for Water Connections Flow RatesCast Iron Headrers Asme Models Unitherm Governor OperationExternal Auxiliary Bypass Valve Where Required Auxiliary Bypass Valve AdjustmentHeat Exchanger Pressure Drop Tables Heat Exchanger Reversal Procedure Polymer Header Models For Asme Models call your factory representativeElectronic Electrical WiringMillivolt System Independently Transformer Wiring 120V Wiring240V Wiring Wiring Diagram Millivolt Mechanical Thermostat Wiring Diagram IID Atmospheric Wiring Diagram IID Low NOx Millivolt Controls General Location of Controlscontrol AdjustmentsControl Panel Removal Fahrenheit vs Centigrade Digital Thermostat ControlsThermostat Control Operation Display Definition DiagnosticsReading a Fault Activating the Remote Remote Control Installation and OperationRemote Operation Remote Control Wiring Wire Remote Control On-OffPressure Switch Flame ROLL-OUT Safety SwitchPilot SAFETY- Millivolt Pilot SAFETY- ElectronicPilot Removal and Cleaning Burner Drawer RemovalGAS Valve Removal Main Burner and Orifice RemovalTubecleaningprocedure DesootingprocedureImmersion Well Replacement Unitherm Governor U.G. ReplacementSTART-UP Procedures BurneradjustmentBlower Adjustment Flame ROLL-OUT Safety SwitchPilot Removal Combustion FAN RemovalTroubleshooting Guide MechanicalforqualifiedservicepersonnelonlyElectrical Standing Pilot Millivolt Raypak Pool or SPA Heater Electrical Check with MV GAS ValveElectrical Electronic Ignition IID Troubleshooting For qualified technicians onlyDigital Control Logic Flow Chart Eastman Avenue Oxnard, CA For Canada Replacement PartsRAYPAK, INC Illustrated Parts List Pilot Assemblies Page Page Page Page Page
Related manuals
Manual 46 pages 34.19 Kb

P-R185B to R-P405B, C-R185B to C-R405B, P-R185BL to P-R405BL, C-R185BL to C-R405BL, RP2100 specifications

Raypak is a leading manufacturer in the heating and cooling industry, renowned for its innovative products that cater to both residential and commercial sectors. One of its product lines, the RP2100 series, exemplifies cutting-edge technology and features designed to enhance efficiency and performance in pool heating systems.

The RP2100 models, particularly the P-R185B through R-P405B series, incorporate advanced heat exchanger technology, enabling them to offer exceptional heat transfer efficiency. The titanium heat exchangers are designed for durability and resistance against corrosion, particularly in saltwater environments, ensuring the longevity of the system. These units are engineered for both outdoor and indoor applications, with the versatility to adapt to various heating requirements.

In terms of energy efficiency, the RP2100 series boasts a high coefficient of performance (COP), making them cost-effective solutions for pool heating. They are equipped with digital thermostats that provide accurate temperature control, ensuring consistent heating capabilities while minimizing energy consumption. The inclusion of intelligent controls allows for seamless integration with existing systems and provides users with the ability to schedule heating cycles, further enhancing energy savings.

Moving beyond the RP2100 series, the C-R185B to C-R405B models are specifically tailored for commercial applications, combining robust performance with user-friendly features. These commercial heaters are designed to handle larger volumes of water and are built to withstand the rigors of high-traffic environments, such as resorts and sports complexes. Their vertical design optimizes space and promotes better airflow, which is crucial in high-demand scenarios.

The P-R185BL to P-R405BL and C-R185BL to C-R405BL models feature noise-reducing technology, making them suitable for residential settings where peace and quiet are paramount. They utilize advanced acoustic insulation materials that minimize operational noise without sacrificing performance.

In summary, the Raypak RP2100, P-R185B to R-P405B, C-R185B to C-R405B, P-R185BL to P-R405BL, and C-R185BL to C-R405BL series represent the pinnacle of innovation in pool heating solutions. With their durable construction, energy-efficient designs, and advanced technologies, these models are ideal for users seeking reliability, efficiency, and quiet operation in both residential and commercial environments. Investing in Raypak products ensures superior heating performance, longevity, and overall satisfaction.