BURNER DRAWER REMOVAL

1.Shut off main electrical power switch to heater.

2.Shut off gas upstream of heater.

3.Remove front door.

4.Disconnect gas line from gas valve.

5.Remove (2) screws that mount burner tray to unit, and (2) screws that secure gas valve to jacket.

6.Disconnect wires that terminate at gas valve.

7.Slide out burner tray.

8.Reverse above procedure to reinstall.

GAS VALVE REMOVAL

1.Shut off gas supply to the heater. Remove gas piping to gas valve inlet.

2.Disconnect wires, pilot tubing and bleed line, if required.

3.Turn vertical gas pipe from manifold slightly and unscrew gas valve.

4.Reverse above procedure to reinstall.

MAIN BURNER AND ORIFICE REMOVAL

1.Remove burner drawer, following procedure above.

2.Remove screws and burner hold-down bracket.

NOTE: If the heat exchanger is sooted badly, the burner hold-down bracket and spacer can become dis- torted from direct flame impingement and this usually necessitates replacement of these parts.

3.Lift burners from slotted spacers and slide from orifices. Clean with a wire brush.

4.Orifices usually do not need to be replaced. To clean, run either copper wire or wood toothpick through orifice. Do not enlarge hole. To remove orifice, use a socket wrench and remove from manifold. DONOT overtighten when reinstalling.

Burners

Burner Hold-Down Bracket

Fig. # 9479

PILOT REMOVAL AND CLEANING

1.Disconnect pilot tubing and wires from gas valve.

2.Remove pilot assembly from burner tray.

3.Remove pilot from bracket.

4.Remove pilot orifice and air opening (Honeywell MV unit only), and clean with wire or small brush.

CAUTION! Do not enlarge hole in pilot orifice.

5. Reverse above procedure to reinstall.

HONEYWELL PILOT ROBERTSHAW PILOT

PilotPilot

Air

Opening

Orifice

Orifice

Fig. # 8045.1

Fig. # 8102.0

HEAT EXCHANGER REMOVAL

1.Shut water, gas and electricity off, close valves and relievepressureandremovereliefvalve. Removeside inspection panels.

2.Remove top holding screws.

3.Remove draft diverter, lift and remove top and flue collector. Remove inspection panels.

4.Disconnect wires from high limits and pressure switch. Remove temperature sensor.

5.Disconnect flange nuts on inlet-outlet header, loosen union(s) at gas pipe and slide boiler away from piping.

6.Lift heat exchanger straight up using caution not to damage refractory.

7.Reverse above procedure to reinstall. Make sure the insulation strips are properly replaced on top of the refractory retainer.

35

Image 35
Contents What to do if YOU Smell GAS Installation and Operating InstructionsPage Contents Before START-UP Burners Water START-UP ProceduresFor Your Safety Read Before Operating To Turn OFF GAS to Appliance Millivolt SystemLighting Instructions Operating Instructions Electronic Ignitions SystemsWhat to do if YOU Smell GAS Visual Inspection Maintenance and Care ProceduresWater Pressure Switch After START-UPCold Weather Operation Pool & SPA Water ChemistryAutomatic Chlorinators Chemical Feeders Winterizing the Pool & SPA Heater Standardunitpolymerheaders Asme Unit Cast Iron Headers General SpecificationsReceiving Equipment Installation Instructions Installations only OutdoorheaterinstallationIndoor KIT Includes Indoor Heater InstallationOutdoor KIT Includes Securing the TOP Panel Cover Outdoor KIT only Installing the Clips Indoor & Outdoor KitsSecuring the TOP Panel Cover Indoor KIT only Installing the TOP Cover Outdoor KIT only Combustion and Ventilation AIR Indoor Units Only Specifications and DimensionsGAS Supply Connections Vent PipingPipe Sizing for GAS Connections GAS Pressure Adjustment LocationsGAS Pressure Regulator Flow Rates Plumbing for Water ConnectionsUnitherm Governor Operation Cast Iron Headrers Asme ModelsAuxiliary Bypass Valve Adjustment External Auxiliary Bypass Valve Where RequiredHeat Exchanger Pressure Drop Tables For Asme Models call your factory representative Heat Exchanger Reversal Procedure Polymer Header ModelsElectronic Electrical WiringMillivolt System Independently Transformer Wiring 120V Wiring240V Wiring Wiring Diagram Millivolt Mechanical Thermostat Wiring Diagram IID Atmospheric Wiring Diagram IID Low NOx Millivolt Controls General Location of Controlscontrol AdjustmentsControl Panel Removal Fahrenheit vs Centigrade Digital Thermostat ControlsThermostat Control Operation Display Definition DiagnosticsReading a Fault Activating the Remote Remote Control Installation and Operation Remote Operation Wire Remote Control On-Off Remote Control WiringPilot SAFETY- Electronic Pressure SwitchFlame ROLL-OUT Safety Switch Pilot SAFETY- MillivoltMain Burner and Orifice Removal Pilot Removal and CleaningBurner Drawer Removal GAS Valve RemovalUnitherm Governor U.G. Replacement TubecleaningprocedureDesootingprocedure Immersion Well ReplacementFlame ROLL-OUT Safety Switch START-UP ProceduresBurneradjustment Blower AdjustmentCombustion FAN Removal Pilot RemovalMechanicalforqualifiedservicepersonnelonly Troubleshooting GuideRaypak Pool or SPA Heater Electrical Check with MV GAS Valve Electrical Standing Pilot MillivoltFor qualified technicians only Electrical Electronic Ignition IID TroubleshootingDigital Control Logic Flow Chart Eastman Avenue Oxnard, CA For Canada Replacement PartsRAYPAK, INC Illustrated Parts List Pilot Assemblies Page Page Page Page Page
Related manuals
Manual 46 pages 34.19 Kb