Zenoah BCZ2600SW manual SE6, SE7 SE8 SE9 Mounting Engine SE5, Putting on Waist PAD,  13 

Page 13

6.Set up (BCZ2600SW)

SE5

SE6

SE7

SE8

(1)

(2)

SE9

MOUNTING ENGINE (SE5)

1.Push the driveshaft housing toward the clutch housing and rotate it by hand to check that the driveshaft is engaged with the gears.

2.Insert the driveshaft housing into the clutch housing until it bottoms, and align the positioning holes on the clutch housing and the shaft tube and install the screw. When difficult to engage, twist the engine slightly.

3.Fasten the clamp securely with two screws.

IMPORTANT

Tighten the screws gradually by turns.

INSTALLING HANDLE

Mount the handle to the shaft tube and clamp it at a location that is comfortable to you. (SE6)

(1) About 14.5 inches (37cm)

CONNECTING THROTTLE WIRE

1. Remove the air cleaner cover.

2. Connect the end of the throttle wire to the joint on the top of the carburetor. (SE7)

CONNECTING SWITCH WIRES

Connect the switch wires between the engine and the main unit. Pair the wires of the same color. (SE7)

PUTTING ON WAIST PAD

Wrap the waist pad around the shaft tube and the throttle wire. (SE8)

(1)Waist Pad

(2)Band

INSTALLING DEBRIS GUARD

Put the debris guard on the gear box, attach it with the 4 screws and hardware provided. (SE9)

(1)Debris guard

(2)Plate

(3)Washer

(4)Screw

13

Image 13
Contents BCZ2600SU BCZ2600SWContents Safety FirstParts location Specifications 4   5  Symbols on the machineWorking Condition For safe operationWorking Circumstance  6  7  Working PlanStarting the Engine Before Starting the Engine 8   9  Using the ProductIf Someone Comes MaintenanceHandling Fuel  10  11  Transportation 12  SE6 SE5SE7 SE8 SE9 Mounting Engine SE5 Putting on Waist PADInstalling Cutting Head SE10 Set upBalance Unit  14 Fuel HOW to MIX FuelRecommended Mixing Ratio Gasoline 50OIL  15 For Your Engine LIFE, Avoid Fueling the Unit 16  OP1 OperationStarting Engine OP4 18  OP7 Adjusting the Line Length 19  Maintenance Chart MaintenanceMA1  20  21   22  MA8 Procedures to be Performed After Every 100 Hours of USE 23   24  Storage 25  Optional blade usageBCZ2600SU OPT4 OPT3BCZ2600SU OPT5 OPT6  26 Operation OPT7 OPT8Controlling Blade Bounce  27  28  What causes kick outTransporting the Unit OPT9 Maintenance Blade 29  Check Probable Causes Action Troubleshooting guide 30   31  Parts list 32   33  Optional Blade & Accessories 34  Drive Unit BCZ2600SW S/N 300001 and up 35  Optional Blade 36   37  BCZ2600S S/N 50100000 and up BCZ2600SU S/N 50100000 and upLimited Warranty RedMax Garantie limitée Komatsu Zenoah America INC