Troy-Bilt 675B manual To Checkand AdjustTensionon the Re- verse Drive Belt

Page 20

moving partsto come to a complete stop, disconnectspark plug wire and move wire awayfrom

,_ WARNING: Beforeinspecting, cleaning or servicing the machine,shut off engine, wait for all spark plug. Failureto follow these instructions can result in serious personal injury or property

damage.

NOTE: While pushing inward on the

C(E) Removebelt forward idler arm, be sure that the forward drive belt is moved off to the

 

right side of the tiller. This creates

 

more room to install the clevis pin

 

when the forward idler arm is 3ushed

 

inward.

 

IMPORTANT:When the clevis pin Is

 

installed in the inner hole of the forward

 

adjustablelink, the number of additional

 

belt tension adjustments are limited. If,

 

with future tension adjustments, you find

 

that you cannot screw the forward clutch

 

rod any farther into the rectangularnut on

 

the forward clutch bracket,it meansthat

Figure 5-9: Disconnect ForwardClutch Rod

the forward drive belt must be replaced.

and move forward drive belt out of groove in

Beforedoing so, the clevis pin must be

engine forward drive pulley.

returnedto the OUTSIDEhole inthe

 

forward adjustablelink.

 

8. Replacethe forward drive belt in the

 

High speed groove (groove closest to en-

 

gine) or the Low speed groove (rearmost)

 

groove of the enginedrive pulley andinthe

 

matching groove of the transmission pul-

 

ley. Besure the belt is to the inside of the

 

wire formed belt guide (I, Figure5-12) and

 

to the inside of the forward drive idler pul-

 

ley (J).

Figure 5-10: One or two threads on Forward

 

Clutch Rod should he exposed above rectan-

 

gular nut.

 

Figure5-13

To Checkand AdjustTensionon the Re- verse Drive Belt:

1.Removethe belt cover after first shut- ting off the engine, disconnecting the spark plug wire, and allowing the engine and muffler to cool down.

2.Stand at the front of the tiller and use your left handto push the reverseidler

arm (K, Figure 5-13) inward as far as pos- sible (the reverseidler pulley [L] is at- tached to the reverseidler arm).

Hold the idler arm in this position and look at the position of the belt tension guide mark (M, Figure5-14) that is stamped into the face of the reverseadjustable link (N, Figure 5-14).

The tension is correct if the guide mark

(M, Figure5-14) is anywhereto the left of the guide pin (0), as viewed from the

Figure 5-12: Topview of belts and pulleys.

Figure5-11: Remove clevis pin from outer

hole in forwardadjustable link and move to in- ner hole in link.

9.Reinstallthe belt cover and secure it with the two nuts.

10.Readjustthe forward drive belt tension by following the instructions in Section 3: HandlebarHeight Adjustment.

Figure5-14:While pushing reverse idler arm #l-

ward, standat engineendandcheckpositionof guidemark (M) andguidepin (0).

2O

Image 20
Contents Formno -00586B 13/04Findingmodelnumber Safety SafetyAlert SymbolTraining OperationMaintenanceandStorage OrinspectionsItawayfromthesparkplug.MoveWheel GearLevertoENGAGESafetyDecals OperatingSymbolsHotSurfacesMovingBelts FastAssembly Tools/ MaterialsNeeded For AssemblyHardwareBag PartsList Ref. Qty. DescriptionAttachreverseclutch Controlcable Attachforwardclutch ControlcableWhentension is correct, tighten the two jam nuts B securely Checktransmissiongear OIL LevelAttachwheelgearlever CheckairForwardClutchLevers FeaturesandcontrolsTiller Features To AdjustHandlebarHeight EngineControlsDepthRegulatorLever Recoil StarterOperation Starting and Stopping EngineOperatingTiller StoppingtheEngineContact your telephone Wheelsand tines, releaseboth leChangingBelt RangeSpeeds StoppingtheTiller andEngineToChangefrom Lowto HighSpeed To Changefrom Highto LowSpeedTilling Depths Let the Tiller Dothe Work AvoidMaking FootprintsAvoidTilling Soggy,Wet Soil With planning, you can ==..vpClearingthe Tines Loading and UnloadingtheTillerRead the followingrecommendationsbeforetilling on slopes Tilling Up and DownSlopesVertical Tilling Wahning Do notMaintenance EndCap Transmission Gear Oil ServiceCheckHardware Check Tire Air PressureEngineCleaning Air CleanerServiceSpark Plug Service Off SeasonStorage CheckingAndAdjustingTension ToCheckandAdjustTensiononthe Forward DriveBeltOn DriveBelts Meansthe cuttingedges faceTo Checkand AdjustTensionon the Re- verse Drive Belt Removingthe ForwardDriveBelt Forward Drive Belt Removal InstallationInstallingthe ForwardDriveBelt Removingthe ReverseDriveBelt Installingthe ReverseDriveBeltReverse Drive Belt Removal Problem CorrectionHandlebar Assembly and Control Levers PartslistMODEL675B DescriptionReve rse Screw, Ref , securesForwardClutchCable 25, RefBeltGuide,WireFormed HexHd.Screw,546-18 x 2-1/4Bracket,ClutchCable Lockwasher-546Partno Description See NotePartno GW-1714 La GW-9400 Lb GW-9401 GW-20718 GW-9301 1916597 GW-9572 GW-9944OilSeal Shim,1-1J64I.D.,.O62thickA/RShim,asabove,but.OlOthickA/R WheelShaftIncl.Ref.6OFDENOTEST,NECUTT,NGEDGEI Transmission 618-04002 RollPinspiral,1/4x1 BarAssembly,DepthAdjustmentHood,Tine Bracket,Hood&DepthRegulatorROW Marker Attachment Optional Bumper 0EM-290-254REF no TROY-BILT Tiller Lifetime Limited Warranty TROY-BILTLLC, P.O. Box 361131, Cleveland, Ohio 44136-0019