Operator’s Manual | Second Edition • First Printing |
|
|
|
|
Pre-operation Inspection
oBe sure that the operator’s, safety and responsibilities manuals are complete, legible and in the storage container located in the platform.
oBe sure that all decals are legible and in place. See Decals section.
oCheck for battery fluid leaks and proper fluid level. Add distilled water if needed. See Maintenance section.
oCheck for hydraulic oil leaks and proper oil level. Add oil if needed. See Maintenance section.
Check the following components or areas for damage, improperly installed or missing parts and unauthorized modifications:
oElectrical components and wiring
oCoil cord (if equipped)
oHydraulic power unit, hoses, fittings and cylinders
oManual lowering lever
oPlatform end guard rail, platform side guard rails and platform entry gate
oGuard rail lock handles
oSequencing cables and pulleys
oLifting chains and idler wheels
oNuts, bolts and other fasteners
oMast and mast braces
oBreather cap
oOutriggers, leveling jacks and footpads
oGuard rail lift arm
oPlatform entry ladder
Check entire machine for:
oDents or damage
oCorrosion or oxidation
oCrack in welds or structural components
oInspect and clean battery terminals and all battery cable connections.
oBe sure that all structural and other critical components are present and all associated fasteners and pins are in place and properly tightened.
10 | Genie DPL Super Series | Part No. 82799 |