Genie DPL-35S, DPL-30S manual Battery and Charger Instructions Observe and Obey, To Charge Battery

Page 23

Second Edition • First Printing

Operator’s Manual

 

 

 

 

Battery and Charger

Instructions

Observe and Obey:

Do not use an external charger or booster battery.

Charge the battery in a well-ventilated area.

Use the proper AC input voltage for charging as indicated on the charger.

Use only Genie authorized battery and charger.

To Charge Battery:

1Slide open the battery cover to access the charger and the battery. The cover must remain open for the entire charging cycle.

2Remove the battery vent caps and check the battery acid level. If necessary, add only enough distilled water to cover the plates. Do not overfill prior to the charge cycle.

3Install the battery vent caps.

4Connect the battery charger to a grounded outlet of proper voltage and amperage as indicated on the battery charger.

OPERATING INSTRUCTIONS

5Set the timer based on the amount of use:

Light Use (less than 15 lifting cycles): Set to 7 hours.

Heavy Use (greater than 15 lifting cycles): Set to the on position.

6The charger will automatically shut off at the end of the set period.

Note: If the ammeter drops to 3A or less within the first 15 minutes, the battery is fully charged.

7Check the battery acid level when the charge cycle is complete. Replenish with distilled water to the bottom of the fill tube.

Dry Battery Filling And

Charging Instructions

1Remove the battery vent caps and permanently remove the plastic seal from the battery vent openings.

2Fill each cell with battery acid (electrolyte) until the level is sufficient to cover the plates.

Do not fill to the maximum level until the battery charge cycle is complete. Overfilling can cause battery acid to overflow during charging. Neutralize battery acid spills with baking soda and water.

3Install the battery vent caps.

4Charge the battery for seven hours or until the charger ammeter reads 3A or less.

5Check the battery acid level when the charge cycle is complete. Fill with distilled water to the bottom of the fill tube.

Part No. 82799

Genie DPL Super Series

21

Image 23
Contents Operator’s Manual Contact us ContentsDo Not Operate Unless Safety RulesTip-over Hazards Fall Hazards Component Damage Hazards Electrocution HazardsCollision Hazards Decal Legend Improper Use HazardDamaged Machine Hazards Bodily Injury HazardLifting Hazard Battery and Charger Safety DC Models Burn HazardsExplosion Hazards Platform Controls ControlsPage Fundamentals Pre-operation InspectionBreather Cap AC & DC Models Pre-operation Inspection Observe and Obey MaintenanceCheck the Hydraulic Oil Level AC and DC Models Check the Battery DC ModelsScheduled Maintenance Function Tests Function TestsTest Emergency Stop Test Outrigger Interlock Workplace Inspection Workplace Inspection Operating Instructions Platform Raise and Lower SetupEmergency Stop Fall Protection Platform Overload Indicator Light if equippedManual Lowering Auxiliary Platform Lowering AC & DC ModelsDry Battery Filling Charging Instructions Battery and Charger Instructions Observe and ObeyTo Charge Battery Winching the Machine onto a Flatbed Truck Transport and Lifting InstructionsLoading the Machine With a Forklift Transport and Lifting Instructions Lifting InstructionsInspection for Decals with Words DecalsDecals Inspection for Decals with Symbols Decals Maximum capacity SpecificationsDistributed By