Nortel Networks 8000, 5399 quick start Roadmap, Task 9 Reboot the RAC, Task 10 Customizing the RAC

Page 26

Quick-Start Guide for Nortel Networks 5399 and 8000 Access Switches

6.Set up the RAC so that addresses are on the DS0s.

admin: wan 1

admin: set wan=1 ds0=all remote_address <starting ip address> 1

admin: reset wan

Note: IP addresses are incremented from the starting IP address using an increment of 1. Addresses will be applied on all DS0s and will be used at random as the DS0s are used at random. Addresses are assigned to users once they dial in.

Task 9: Reboot the RAC

After making all the configuration changes, you must reboot the RAC for the changes to take effect. After you reboot the RAC:

1.Connect the cables to the WAN interface ports on the front (Model 5399) or back (Model 8000) of the RAC.

2.Test the RAC by dialing into it.

Task 10: Customizing the RAC

After installing and booting the RAC, you can customize RAC parameters (for example security or port parameters) using one of the following tools:

CLI interface (see Managing Nortel Networks 5399 and 8000 Access Switches Using Command Line Interfaces)

Config Utility (see Installing and Administering the Config Utility and the Config Utility online Help system)

Roadmap

The roadmap provides a series of tasks that you must perform in sequential order to install, configure, and boot a RAC. Refer to the specified documentation for detailed instructions. The roadmap can be divided into two distinct sections: installation and configuration, and customization.

14

300855-C Rev. 00

Image 26
Contents Page Restricted Rights Legend Copyright 1999 Nortel NetworksTrademarks Statement of ConditionsIii Rev.00 Contents Page Preface Before You BeginText Conventions Acronyms Related Publications How to Get Help Technical Solutions Center Telephone NumberPage Quick-Start Guide Quick-Start TasksQuick-Start Tasks IP Addresses Task 1 Site PreparationOrder Line Provisioning Boot Sequence Task 2 Install RAC SoftwareTask 3 Install the RAC Software ImagePress the space bar to enter monitor mode Task 4 RAC ConfigurationEnter r slot number to reset Set the Network Addresses At the ROM monitor prompt, enter seq. The system responds Configure the Interface SequenceSet the Operating Image Task 5 Boot the RAC Enable the allowsnmpsets ParameterTask 6 Configure the Switch Type Admin set wan=1 switchtype AT9ACP Security Task 7 Set Switch ParametersTask 8 Configure Security Set the RAC’s ACP host Set vcli securitySet the RAC’s accounting host Configure the Radius host Set the RAC’s Radius hostRadius Security Set PPP security protocol Reboot the RAC for the configuration changes to take effectPPP Setup Roadmap Task 9 Reboot the RACSet up the RAC so that addresses are on the DS0s Task 10 Customizing the RACInstalling and Configuring the RAC Task DocumentationTask Tools and Documentation Customizing the RAC Windows NTRAC Reference Documentation Quick-Start Guide