START
Unpacking*
Marking and Drilling*
Installation of Main Equipment
Connection of Battery*
Switch Setting of DAIB Card
Mounting of DAIB Card
Switch Setting of DAIC Card
Mounting of DAIC Card
Switch Setting of
Line/Trunk Circuit Cards*
Mounting of
Line/Trunk Circuit Cards
Power Failure Transfer (PFT)
See Section 2.2.1
See Section 2.2.2
See Section 2.1.3
See Section 2.2.4
See Section 2.2.6 See Section 2.2.7
See Section 2.2.9
Note 2
Cable Running to MDF*
Termination of Cables on MDF*
Connection between
Main Site and Remote Site
MP Reset
System Initialization
and System Data Entry*
Operation Test*
Cleaning and Visual Check*
Mounting of Front Cover*
END
See Section 2.3
See Section 2.4
Note 1: This manual describes only the installation procedure exclusively required for the Remote PIM System. Refer to the Installation Procedure Manual for the procedures marked by * .
Note 2: It is recommended that the Power Failure Transfer (PFT) is provided on the Remote Site in case the link between the main site and the remote site is lost.
Figure 3-4 Installation Procedure for Remote Site
ND-46550 (E)CHAPTER 3
Page 17