| LIST OF TABLES |
|
Table | Title | Page |
PIM Configuration | 4 | |
Required Equipment | 6 | |
System Capacity | 8 | |
Lamp Indications on | 19 | |
Switch Settings on | 20 | |
Switch Settings When Clock Signal Supplied From Master Office | 22 | |
Lamp Indications on | 25 | |
Switch Settings on | 25 | |
Lamp Indications on | 35 | |
Switch Settings on | 36 | |
LTC Connector Accommodation (Small Platform) | 45 | |
LTC Connector Accommodation (1000 IVS) | 48 | |
LTC Connector Accommodation | 51 | |
Remedial Action on Each Lamp Status | 67 |
Page v
Revision 2.0