IBM DCS9550 1S1 manual Taiwan Contact Information How to Send Your Comments

Page 11

P r e f a c e

Taiwan Contact Information

How to Send Your Comments

Your feedback is important in helping us to provide the most accurate and high-quality information. If you have comments or suggestions for improving this publication, you can send us comments electronically by using the following address:

Internet: starpubs@us.ibm.com

You can also mail your comments by using the Readers’ Comments Form in the back of this manual or direct your mail to:

International Business Machines Corporation

Information Development Dept. GZW

9000 South Rita Road

Tucson, AZ 85744–0001

U.S.A.

IBM System Storage DCS9550 1S1 Storage Expansion Unit Installation, Service, and User Guide

ix

Image 11
Contents IBM System Storage Page Preface International Standards Safety Guidelines Figure P-3PSU/Cooling Module Caution Label Figure P-5 PSU Safety Label Electric Shock Hazard Inside Class 1 Laser Product Avis de conformité à la réglementation d’Industrie Canada ESD Precautions Data Security Taiwan Contact Information How to Send Your Comments Page Page Contents Xiii IBM System Storage DCS9550 1S1 Storage Expansion Unit Introduction2Enclosure Chassis Front Enclosure ChassisMultiple Power Supply/Cooling Modules Power Supply/Cooling ModuleOperators Panel Ops Panel Indicators and SwitchesSCM Input/Output Module DCS9550 Controller Settings6SCM I/O Module 7SCM Front Panel as viewed from rear of Enclosure Sata Dual Path Transition Card Drive Status IndicatorsDrive Carrier Module Blank Modules Anti-tamper LocksDummy Carrier Modules PSU Safety and EMC Compliance DimensionsWeight AC Power 450W PSUAirflow EnvironmentInterfaces SCM I/O Module SpecificationDrive Carrier Module Specification Software Enclosure Services SES Support This page is intentionally blank Planning Your Installation Installation1Module locations Enclosure Bay Numbering ConventionRack Mounting Rail Kit Enclosure Installation ProceduresChassis Installation Parts Check List Pre-RequisitesPower Supply/Cooling Module Procedure ProcedurePower Supply/Cooling Module Installation 2AC Power Supply/Cooling Module Handle in Open Position FC-AL Interface SCM I/O Module ConfigurationsInternal Loop Structures Unit 1-S Unit 2- S 7IBM System Storage DCS9550 Couplet Cabling SCM I/O Module InstallationDrive Enclosure Device Addressing Switch Function Recommended Definition Number SettingSwitch Function Recommended Row Column Drive ConfigurationDrive Carrier Installation Parts Check List 10Installing a Sata Drive Carrier Module Activating the Locks Engaging the Anti-tamper Locks13Activating the Anti-tamper Lock Power Cord Connection Parts Check ListGrounding Checks This page is intentionally blank Operation Power OnAC PSU Power Supply/Cooling Module LEDsLED Ops Panel LEDsDisk Drives LEDs Power DownStarting the Drives Emulation Limitations Initial Start-up Problems Faulty CordsLEDs Alarm Sounds On Power UpGreen Signal Good LED on SCM Not Lit Ops Panel LED SCM I/O Module LEDs Audible AlarmAudible Alarm Mute Power Supply/Cooling Faults TroubleshootingSystem Faults Thermal Control Power supplies FittedThermal Shutdown Thermal AlarmDrive Carrier Module Faults Replacing a Module Dealing with Hardware FaultsContinuous Operation During Replacement Inserting the Module 2Removing/Inserting an AC Power Supply/Cooling Module Removing the Module SCM I/O Module5Removing an SCM I/O Module 7SCM I/O Module Latch Operation Removal and ReplacementSpare Parts and Ancillary Items IBM MTM 1269-1S1 Sata Disk Chassis FRUsThis page is intentionally blank Glossary Page Index System LED For additional information, visit the web at Trademarks Page Page Readers’ Comments We’d Like to Hear from You Business Reply Mail Page SC30-9738-00