
U S E R RESPONSIBLE F O R V E R I F Y I N G VERSION A N D COMPLETENESS
O E M F U N C T I O N A L S P E C I F I C A T I O N U L T R A S T A R X P ( D F H C ) SSA M O D E L S 1.12/2.25 G B - 1.0" H I G H
2.2.8 Bring-up Sequence (and Stop) Times
Figure 10. Start Time Diagram
Note: BATS is the abbreviation for Basic Assurance Tests.
Note: If a R E S E T is issued before the drive comes ready, the power on sequence will start again. In all other cases when a R E S E T is issued the present state of the motor is not altered.
Note: Reference “Start/Stop Unit Time” onpage 49 for additional details.
Note: See 5.7, “Spindle Synchronization” on page 69 for details about
Event | Nominal | Maximum | Notes |
| ||
|
|
|
|
| ||
1.5 sec | 2.0 sec | *see Figure | 10 | |||
|
|
|
|
| ||
12.4 sec | 45 sec. | *see Figure | 10 | |||
|
|
|
|
|
|
|
8.2 | sec | 29.2 | sec | *see Figure | 10 | |
|
|
|
|
|
|
|
Spindle Stop | 6.0 | sec | 12.0 | sec |
|
|
|
|
|
|
|
|
|
Table 3.
Page 36 of 87 | I B M Corporation |
Source filename=BRINGUP