Cisco Systems manual 50Cisco IGX 8400 Series Installation and Configuration

Page 50

IGX Configuration Summary

Set up any subrate trunk interface control templates if desired (cnftrkict).

For setting up voice lines:

Activate the line (upcln or upln).

Configure the line ( cnfln ). If you use cnfln to configure the line for voice SVC caching in conjunction with VNS, see to the VNS documentation for a description of this service and the CVM or UVM description in the Cisco IGX 8400 Series Reference for line-information.

Configure redundancy ( addyred).

For setting up data lines and ports:

Activate the line (upcln).

Configure the line ( cnfcln).

Configure redundancy ( addyred).

Set up Frame Relay lines and ports. (See the section “Setting Up Frame Relay Ports and Connections (UFM)” or “Setting Up Frame Relay Ports and Connections (FRM)” for a description.)

Activate each port (upfrport).

Specify a mode for the card as needed if the card is a UFM-U (cnfmode). To determine the current mode of a particular UFM-U, use dspmode.

For setting up ATM lines and ports:

Activate the line (upln).

Configure the line ( cnfln ).

Activate the ports (upport).

Configure the ports ( cnfport)

For a UXM-E, specify cellbus bandwidth as needed (cnfbusbw—a superuser command).

For setting up voice connections:

Add the connections (addcon).

Configure connection parameters ( cnfvchadv, cnfchdl, cnfchec, cnfchgn, cnfcond, cnfcondsc, cnfrcvsig, cnfsmtsig, cnfvchtp, cnfchutl)

For only the UVM, additional configuration commands you can use are: ( cnfuvmchparm, cnfchfax, cnflnpass . (Use dsplncnf to check whether the port is configured for External, Pass-through, Blocking, or Inserting.)

3-50Cisco IGX 8400 Series Installation and Configuration

Image 50
Contents Card Installation and Node Startup Preparing the CardsPreparing the Cards IGX 8410 Cards, Front View IGX 8410 Cards, Back View IGX 8420 Card Shelf, Front View IGX 8430 Back View Inserting the Cards Inserting ModulesMaking Signal Connections HssiBringing Up a UXM-E Trunk Connecting TrunksSetting Up a UXM-E Cable Management Inverse Multiplexing over ATM on Trunks DspcdsAdding an IMA Feeder Trunk Adding Links to an IMA Feeder GroupUXM-E Inverse Multiplexing ATM IMA Lines Removing Links from an IMA Feeder GroupConnecting an NTM T1 or Y1 Trunk Connecting an NTM E1 or Subrate TrunkBringing Up a UXM-E in UNI or NNI Port Mode Installing Voice Cards Connecting a CVM to a T1 or J1 LineConnecting a CVM to an E1 Line or a Subrate Trunk TDM Transport on the CVMConnecting a UVM to T1 Lines Pass-Through and Standard External UVM T1 Cabling Connecting a UVM to E1 Lines Pass-Through and Standard External UVM E1 Cabling Connecting a UVM to J1 Lines 10 Pass-Through and Standard External UVM J1 Cabling Making Serial Data Connections 11 SDI and LDI FaceplatesConfiguring the Port Modes of the HDM Back Cards Configuring the Mode of an LDI Port HDM and LDM Redundancy13 Connecting a DTE or DCE Adapter Cable to an LDI Making Frame Relay Connections Maximum Connections Per Port with Signalling ProtocolsSetting Up Frame Relay on a UFM Cable Redundancy on the UFMs14 Y-Cable Redundancy with Single and Dual-Port Cabling Connecting UFM Cabling Setting Up Frame Relay Ports and Connections UFMDeleting a Frame Relay Port Setting Up Frame Relay on an FRMCommands for T1/E1 Frame Relay Port Mode Selection for V.35 15 Setting the Port Mode DTE/DCE on an FRI Frame Relay Card RedundancySetting Up Frame Relay Ports and Connections FRM Making Alarm Relay Output Connections 36Cisco IGX 8400 Series Installation and Configuration Attaching Peripherals Connecting a Single Network Management StationMaking External Clock Connections 16 Connecting the Control Terminal LAN Connection for the Network Management Station 17 LAN Connection to SCMConfiguring the LAN Port D2.cb1 LAN superuser IGX 42Cisco IGX 8400 Series Installation and Configuration Connecting a Network Management Station to Multiple Networks Connecting the Printer 20 Connecting a Network PrinterConnecting a Modem 21 Connecting Modems to an IGX NodeConnecting the Power Supply Monitor Initial Startup of the IGX NPM Startup Diagnostic Test Fail screen looks like thisCard Self Test Inspecting Status LightsChecking the Power Supplies AC Systems IGX Configuration Summary50Cisco IGX 8400 Series Installation and Configuration Configuring an IGX Switch to Be an Interface Shelf Interworking Connections in a Tiered NetworkAdding Connections in a Tiered Network through the CLI Converting a Routing Node to an Interface Shelf