Cisco Systems N3KC3524P10G manual Ports for the Cisco Nexus 3548 Switch

Page 34

Chapter 1 Overview of the Cisco Nexus 3000 Series Switches

Cisco Nexus 3548 Switch

Se n d d o c u m e n t c o m m e n t s t o n ex u s 3 k - d o c f e e d b a ck @ c i sc o . c o m

Figure 1-8 Rear View of the Cisco Nexus 3548 Switch

1

One pps port, one console port , one USB port, one management port

2

48fixed Small Form-Factor Pluggable (SFP+) ports

Ports for the Cisco Nexus 3548 Switch

The switch chassis includes the following ports:

Fixed 1- and 10-Gigabit Ethernet Small Form-Factor Pluggable (SFP+) ports (48 ports)

1-PPS timing port (1 port)

10/100/1000 management ports (2 ports)

Console port (1 port)

USB port (1 port)

The chassis has 48 1- and 10-Gigabit Ethernet ports that you connect to servers, which are often in the same rack or a nearby rack. You use Small Form factor Pluggable Plus (SFP+) transceivers with copper or optical cables to connect the switch to the servers. The ports are numbered from left to right from 1 to 48 with the odd-numbered ports on top and the even-numbered ports on the bottom.

You useone 1-PPS timing port, with the RF1.0/2.3 QuickConnect connector type.

Two 100/1000 Ethernet management ports enable you to manage switch operations. You can connect to the switch through these two ports by using an RJ-45 connector on a copper cable.

One RS-232 serial console port enables you to initially configure the switch and to perform troubleshooting operations.

One USB port enables you to save or load switch configurations.

 

Cisco Nexus 3000 Series Hardware Installation Guide

1-18

OL-25338-04

Image 34
Contents Cisco Nexus 3000 Series Hardware Installation Guide Americas HeadquartersPage N T E N T S Airflow Direction Chassis Weight Chassis and Module Information E-4 Contents Organization AudienceChapter and Title Description Conventions Bewaar Deze InstructiesGuarde Estas Instruções Spara Dessa Anvisningar GEM Disse Anvisninger Xii Related Documentation Command References Configuration GuidesInstallation and Upgrade Guides Error and System MessagesObtaining Documentation and Submitting a Service Request Xvi Cisco Nexus 3016 Switch Airflow Direction Layer 3 License Part NumberChassis for the Cisco Nexus 3016 Switch Front View of the Cisco Nexus 3016 SwitchPorts for the Cisco Nexus 3016 Switch ID LEDPower Supply for the Cisco Nexus 3016 Switch Airflow Direction Power Supply Part NumberPort Connections for the Cisco Nexus 3016 Switch Fan Tray for the Cisco Nexus 3016 SwitchPart Number Transceivers and Cables Chassis for the Cisco Nexus 3048 Switch Cisco Nexus 3048 SwitchPower Supply Airflow Direction Layer 3 License Part Number Front View of the Cisco Nexus 3048 Switch Ports for the Cisco Nexus 3048 Switch Rear View of the Cisco Nexus 3048 SwitchPower Supply for the Cisco Nexus 3048 Switch Fan Tray for the Cisco Nexus 3048 Switch Port Connections for the Cisco Nexus 3048 SwitchCisco Nexus 3064 Switch Chassis for the Cisco Nexus 3064 Switch Front View of the Cisco Nexus 3064 SwitchPorts for the Cisco Nexus 3064 Switch Rear View of the Cisco Nexus 3064 SwitchPower Supply for the Cisco Nexus 3064 Switch Fan Tray for the Cisco Nexus 3064 Switch Port Connections for the Cisco Nexus 3064 Switch Cisco Nexus 3548 Switch Chassis for the Cisco Nexus 3548 SwitchPower Supplies Fan tray Ports for the Cisco Nexus 3548 Switch Rear View of the Cisco Nexus 3548 SwitchPower Supply for the Cisco Nexus 3548 Switch Fan Tray for the Cisco Nexus 3548 SwitchPort Connections for the Cisco Nexus 3548 Switch SFP-10G-ER Cisco Nexus 3000 Series Hardware Installation Guide Statement Installation Options with Racks and Cabinets Preparing for InstallationAirflow Direction Chassis Weight Installation GuidelinesCisco Nexus 3000 Series Hardware Installation Guide Installing the Switch Unpacking and Inspecting the SwitchQuantity Part Description ChassisStep Installing the Slider Rails Sliding the Chassis Into the Rack Grounding the Switch Electrostatic Discharge Damage, page·2-14Proper Grounding Practices Environment Severity Level Grounding RecommendationsEstablishing the System Ground Required Tools and Equipment Grounding the Cisco Nexus 3000 Series ChassisPreventing Electrostatic Discharge Damage Grounding a Cisco Nexus 3000 Series ChassisOL-25338-04 Attaching the ESD Wrist Strap to the System Ground Lug Screw Starting the Switch 331410 OL-25338-04 Cisco Nexus 3000 Series Hardware Installation Guide Connecting to the Network Connecting to the Console Port Preparing for Network ConnectionsConnecting to the Management Port Connecting to a ServerInstalling and Replacing SFP or SFP+ Transceivers Installing an SFP or SFP+ TransceiverInstalling Optical Cables into SFP or SFP+ Transceivers Replacing an SFP or SFP+ TransceiverInstalling an Optical Cable into an SFP or SFP+ Transceiver Maintaining SFP and SFP+ Transceivers and Fiber-Optic Cables Cisco Nexus 3000 Series Hardware Installation Guide Replacing a Power Supply Removing an AC Power SupplyInstalling an AC Power Supply Removing a DC Power Supply Installing a DC Power Supply Replacing a Fan TrayRemoving a Fan Tray, Installing a Fan Tray, Removing a Fan TrayInstalling a Fan Tray Cabinet and Rack Requirements General Requirements for Cabinets and RacksRequirements Specific to Perforated Cabinets Requirements Specific to Standard Open RacksCable Management Guidelines Cisco Nexus 3000 Series Hardware Installation Guide Environmental Specifications Switch SpecificationsSwitch Height Width Depth Weight Property Cisco Nexus 3000 Series Switch Power SpecificationsProperty AC Power Supply N2200-PAC-400 W Property AC Power Supply N2200-PAC-400 W Appendix B Technical Specifications Power Specifications Cable and Connector Specifications Console CableLength Supported Power Cords and PlugsConsole Port Description Feet Meters IllustrationCAB-N5K6A-NA CAB-9K10A-AU Figure C-6 SFS-250V-10A-ID CAB-9K10A-SW CAB-N5K6A-NA Jumper Power Cord Figure C-15LED Descriptions Component Chassis and Module LED DescriptionsStatus Description Condition Power Supply StatusPort LEDs Fail LED Status AmberRight Off No activity Blinking green Activity Site Planning and Maintenance Records Site Preparation ChecklistTask No Planning Activity Verified By Time Date Contact and Site Information Chassis and Module Information D E IN-2 IN-3 IN-4 IN-5 IN-6