Cisco Systems N3KC3524P10G manual Ports for the Cisco Nexus 3048 Switch

Page 24

Chapter 1 Overview of the Cisco Nexus 3000 Series Switches

Cisco Nexus 3048 Switch

Se n d d o c u m e n t c o m m e n t s t o n ex u s 3 k - d o c f e e d b a ck @ c i sc o . c o m

Figure 1-4 Rear View of the Cisco Nexus 3048 Switch

1

ID and Status LEDs

3

1- and 10-Gigabit Ethernet uplink ports (4)

 

 

 

 

2

10/100/1000 Ethernet downlink ports (48)

4

Grounding pad

 

 

 

 

Ports for the Cisco Nexus 3048 Switch

The Cisco Nexus 3048 switch chassis includes the following ports:

10/100/1000 Ethernet downlink ports (48 ports)

1- and 10-Gigabit Ethernet uplink ports

100/1000 Ethernet management ports (2 ports)

Console port (1 port)

USB port (1 port)

The chassis has 48 10/100/1000 Ethernet downlink ports that you connect to servers, which are often in the same rack or a nearby rack. You use RJ-45 connectors with copper cables to connect the switch to the servers. The ports are numbered from left to right from 1 to 48 with the odd-numbered ports on top and the even-numbered ports on the bottom.

You use up to four 1- and 10-Gigabit Ethernet uplink ports to connect the switch to one to four hosts or switches. You use an SFP or SFP+ transceiver for each of these ports.

Two 100/1000 Ethernet management ports enable you to manage switch operations. You can connect to the switch through these two ports by using an RJ-45 connector on a copper cable.

One console port enables you to initially configure the switch and to perform troubleshooting operations. You use an RJ-45 connector with a copper cable to connect to this port.

One USB port enables you to save or load switch configurations.

Cisco Nexus 3000 Series Hardware Installation Guide

1-8

OL-25338-04

 

 

Image 24
Contents Cisco Nexus 3000 Series Hardware Installation Guide Americas HeadquartersPage N T E N T S Airflow Direction Chassis Weight Chassis and Module Information E-4 Contents Audience OrganizationChapter and Title Description Conventions Bewaar Deze InstructiesGuarde Estas Instruções Spara Dessa Anvisningar GEM Disse Anvisninger Xii Related Documentation Configuration Guides Installation and Upgrade GuidesCommand References Error and System MessagesObtaining Documentation and Submitting a Service Request Xvi Cisco Nexus 3016 Switch Airflow Direction Layer 3 License Part NumberChassis for the Cisco Nexus 3016 Switch Front View of the Cisco Nexus 3016 SwitchPorts for the Cisco Nexus 3016 Switch ID LEDPower Supply for the Cisco Nexus 3016 Switch Airflow Direction Power Supply Part NumberFan Tray for the Cisco Nexus 3016 Switch Port Connections for the Cisco Nexus 3016 SwitchPart Number Transceivers and Cables Cisco Nexus 3048 Switch Chassis for the Cisco Nexus 3048 SwitchPower Supply Airflow Direction Layer 3 License Part Number Front View of the Cisco Nexus 3048 Switch Ports for the Cisco Nexus 3048 Switch Rear View of the Cisco Nexus 3048 SwitchPower Supply for the Cisco Nexus 3048 Switch Fan Tray for the Cisco Nexus 3048 Switch Port Connections for the Cisco Nexus 3048 SwitchCisco Nexus 3064 Switch Chassis for the Cisco Nexus 3064 Switch Front View of the Cisco Nexus 3064 SwitchPorts for the Cisco Nexus 3064 Switch Rear View of the Cisco Nexus 3064 SwitchPower Supply for the Cisco Nexus 3064 Switch Fan Tray for the Cisco Nexus 3064 SwitchPort Connections for the Cisco Nexus 3064 Switch Cisco Nexus 3548 Switch Chassis for the Cisco Nexus 3548 SwitchPower Supplies Fan tray Ports for the Cisco Nexus 3548 Switch Rear View of the Cisco Nexus 3548 SwitchPower Supply for the Cisco Nexus 3548 Switch Fan Tray for the Cisco Nexus 3548 SwitchPort Connections for the Cisco Nexus 3548 Switch SFP-10G-ER Cisco Nexus 3000 Series Hardware Installation Guide Statement Preparing for Installation Installation Options with Racks and CabinetsAirflow Direction Chassis Weight Installation GuidelinesCisco Nexus 3000 Series Hardware Installation Guide Installing the Switch Unpacking and Inspecting the SwitchQuantity Part Description ChassisStep Installing the Slider Rails Sliding the Chassis Into the Rack Grounding the Switch Electrostatic Discharge Damage, page·2-14Proper Grounding Practices Environment Severity Level Grounding RecommendationsEstablishing the System Ground Required Tools and Equipment Grounding the Cisco Nexus 3000 Series ChassisPreventing Electrostatic Discharge Damage Grounding a Cisco Nexus 3000 Series ChassisOL-25338-04 Attaching the ESD Wrist Strap to the System Ground Lug Screw Starting the Switch 331410 OL-25338-04 Cisco Nexus 3000 Series Hardware Installation Guide Connecting to the Network Connecting to the Console Port Preparing for Network ConnectionsConnecting to the Management Port Connecting to a ServerInstalling and Replacing SFP or SFP+ Transceivers Installing an SFP or SFP+ TransceiverInstalling Optical Cables into SFP or SFP+ Transceivers Replacing an SFP or SFP+ TransceiverInstalling an Optical Cable into an SFP or SFP+ Transceiver Maintaining SFP and SFP+ Transceivers and Fiber-Optic Cables Cisco Nexus 3000 Series Hardware Installation Guide Replacing a Power Supply Removing an AC Power SupplyInstalling an AC Power Supply Removing a DC Power Supply Installing a DC Power Supply Replacing a Fan TrayRemoving a Fan Tray, Installing a Fan Tray, Removing a Fan TrayInstalling a Fan Tray Cabinet and Rack Requirements General Requirements for Cabinets and RacksRequirements Specific to Perforated Cabinets Requirements Specific to Standard Open RacksCable Management Guidelines Cisco Nexus 3000 Series Hardware Installation Guide Switch Specifications Environmental SpecificationsSwitch Height Width Depth Weight Power Specifications Property Cisco Nexus 3000 Series SwitchProperty AC Power Supply N2200-PAC-400 W Property AC Power Supply N2200-PAC-400 W Appendix B Technical Specifications Power Specifications Cable and Connector Specifications Console CableSupported Power Cords and Plugs Console PortLength Description Feet Meters IllustrationCAB-N5K6A-NA CAB-9K10A-AU Figure C-6 SFS-250V-10A-ID CAB-9K10A-SW CAB-N5K6A-NA Jumper Power Cord Figure C-15LED Descriptions Chassis and Module LED Descriptions ComponentStatus Description Power Supply Status Port LEDsCondition Fail LED Status AmberRight Off No activity Blinking green Activity Site Planning and Maintenance Records Site Preparation ChecklistTask No Planning Activity Verified By Time Date Contact and Site Information Chassis and Module Information D E IN-2 IN-3 IN-4 IN-5 IN-6