Cisco Systems N3KC3524P10G manual Statement

Page 39
Warning
Only trained and
to install, replace, or service this equipment.
Statement 1017
Warning
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device. Statement 1071
SAVE THESE INSTRUCTIONS
This unit is intended for installation in restricted access areas. A restricted access area can be accessed only through the use of a special tool, lock and key, or other means of security.
Warning
IMPORTANT SAFETY INSTRUCTIONS
Note
Installing the Cisco Nexus 3000 Series Switches
This chapter describes how to install the Cisco Nexus 3000 Series switches. This chapter includes the following sections:
Preparing for Installation, page 2-2
Installing the Switch, page 2-5
Grounding the Switch, page 2-10
Starting the Switch, page 2-17
Before you install, operate, or service the system, see the Regulatory Compliance and Safety Information for the Cisco Nexus 5000 Series, Cisco Nexus 3000 Series, and Cisco Nexus 2000 Series for important safety information.
C H A P T E R
2
Se n d d o c u m e n t c o m m e n t s t o n ex u s 3 k - d o c f e e d b a ck @ c i sc o . c o m

Statement 1030

Note

Each new switch requires license. For information on licensing, see the Cisco NX-OS Licensing Guide.

 

 

 

 

 

qualifiedpersonnelmustbeallowedCisco N xus 3000 Series Hardware Installation Guide

 

 

 

 

 

OL-25338-04

 

2-1

 

 

Image 39
Contents Americas Headquarters Cisco Nexus 3000 Series Hardware Installation GuidePage N T E N T S Airflow Direction Chassis Weight Chassis and Module Information E-4 Contents Audience OrganizationChapter and Title Description Bewaar Deze Instructies ConventionsGuarde Estas Instruções Spara Dessa Anvisningar GEM Disse Anvisninger Xii Related Documentation Error and System Messages Configuration GuidesInstallation and Upgrade Guides Command ReferencesObtaining Documentation and Submitting a Service Request Xvi Airflow Direction Layer 3 License Part Number Cisco Nexus 3016 SwitchFront View of the Cisco Nexus 3016 Switch Chassis for the Cisco Nexus 3016 SwitchID LED Ports for the Cisco Nexus 3016 SwitchAirflow Direction Power Supply Part Number Power Supply for the Cisco Nexus 3016 SwitchFan Tray for the Cisco Nexus 3016 Switch Port Connections for the Cisco Nexus 3016 SwitchPart Number Transceivers and Cables Cisco Nexus 3048 Switch Chassis for the Cisco Nexus 3048 SwitchPower Supply Airflow Direction Layer 3 License Part Number Front View of the Cisco Nexus 3048 Switch Rear View of the Cisco Nexus 3048 Switch Ports for the Cisco Nexus 3048 SwitchPower Supply for the Cisco Nexus 3048 Switch Port Connections for the Cisco Nexus 3048 Switch Fan Tray for the Cisco Nexus 3048 SwitchCisco Nexus 3064 Switch Front View of the Cisco Nexus 3064 Switch Chassis for the Cisco Nexus 3064 SwitchRear View of the Cisco Nexus 3064 Switch Ports for the Cisco Nexus 3064 SwitchFan Tray for the Cisco Nexus 3064 Switch Power Supply for the Cisco Nexus 3064 SwitchPort Connections for the Cisco Nexus 3064 Switch Chassis for the Cisco Nexus 3548 Switch Cisco Nexus 3548 SwitchPower Supplies Fan tray Rear View of the Cisco Nexus 3548 Switch Ports for the Cisco Nexus 3548 SwitchFan Tray for the Cisco Nexus 3548 Switch Power Supply for the Cisco Nexus 3548 SwitchPort Connections for the Cisco Nexus 3548 Switch SFP-10G-ER Cisco Nexus 3000 Series Hardware Installation Guide Statement Preparing for Installation Installation Options with Racks and CabinetsAirflow Direction Installation Guidelines Chassis WeightCisco Nexus 3000 Series Hardware Installation Guide Unpacking and Inspecting the Switch Installing the SwitchChassis Quantity Part DescriptionStep Installing the Slider Rails Sliding the Chassis Into the Rack Electrostatic Discharge Damage, page·2-14 Grounding the SwitchEnvironment Severity Level Grounding Recommendations Proper Grounding PracticesEstablishing the System Ground Grounding the Cisco Nexus 3000 Series Chassis Required Tools and EquipmentGrounding a Cisco Nexus 3000 Series Chassis Preventing Electrostatic Discharge DamageOL-25338-04 Attaching the ESD Wrist Strap to the System Ground Lug Screw Starting the Switch 331410 OL-25338-04 Cisco Nexus 3000 Series Hardware Installation Guide Connecting to the Network Preparing for Network Connections Connecting to the Console PortConnecting to a Server Connecting to the Management PortInstalling an SFP or SFP+ Transceiver Installing and Replacing SFP or SFP+ TransceiversReplacing an SFP or SFP+ Transceiver Installing Optical Cables into SFP or SFP+ TransceiversInstalling an Optical Cable into an SFP or SFP+ Transceiver Maintaining SFP and SFP+ Transceivers and Fiber-Optic Cables Cisco Nexus 3000 Series Hardware Installation Guide Removing an AC Power Supply Replacing a Power SupplyInstalling an AC Power Supply Removing a DC Power Supply Replacing a Fan Tray Installing a DC Power SupplyRemoving a Fan Tray Removing a Fan Tray, Installing a Fan Tray,Installing a Fan Tray General Requirements for Cabinets and Racks Cabinet and Rack RequirementsRequirements Specific to Standard Open Racks Requirements Specific to Perforated CabinetsCable Management Guidelines Cisco Nexus 3000 Series Hardware Installation Guide Switch Specifications Environmental SpecificationsSwitch Height Width Depth Weight Power Specifications Property Cisco Nexus 3000 Series SwitchProperty AC Power Supply N2200-PAC-400 W Property AC Power Supply N2200-PAC-400 W Appendix B Technical Specifications Power Specifications Console Cable Cable and Connector SpecificationsDescription Feet Meters Illustration Supported Power Cords and PlugsConsole Port LengthCAB-N5K6A-NA CAB-9K10A-AU Figure C-6 SFS-250V-10A-ID CAB-9K10A-SW CAB-N5K6A-NA Figure C-15 Jumper Power CordLED Descriptions Chassis and Module LED Descriptions ComponentStatus Description Fail LED Status Amber Power Supply StatusPort LEDs ConditionRight Off No activity Blinking green Activity Site Preparation Checklist Site Planning and Maintenance RecordsTask No Planning Activity Verified By Time Date Contact and Site Information Chassis and Module Information D E IN-2 IN-3 IN-4 IN-5 IN-6