Cisco Systems N3KC3524P10G Preparing for Network Connections, Connecting to the Console Port

Page 60

Chapter 3 Connecting to the Network

Preparing for Network Connections

Se n d d o c u m e n t c o m m e n t s t o n ex u s 3 k - d o c f e e d b a ck @ c i sc o . c o m

Preparing for Network Connections

When preparing your site for network connections to the Cisco Nexus 3000 Series switch, consider the following for each type of interface, and gather all the required equipment before connecting the ports:

Cabling required for each interface type

Distance limitations for each signal type

Additional interface equipment required

Connecting to the Console Port

The console port is an RS-232 port with an RJ-45 interface. (See Figure 3-1.) The console port is an asynchronous (async) serial port; any device connected to this port must be capable of asynchronous transmission.

We recommend using this port to create a local management connection to set the IP address and other initial configuration settings before connecting the switch to the network for the first time.

Caution The console port can be used to connect to a modem. If you do not connect it to a modem, connect it either before powering the switch on or after the switch has completed the boot process.

Figure 3-1shows how to connect to the console port on the Cisco Nexus 3000 Series switch.

Figure 3-1 Connecting to the Console Port on a Cisco Nexus 3000 Series Switch

310031

You can use the console port to perform the following:

Configure the Cisco Nexus 3000 Series switch from the CLI.

Monitor network statistics and errors.

Cisco Nexus 3000 Series Hardware Installation Guide

3-2

OL-25338-04

 

 

Image 60
Contents Cisco Nexus 3000 Series Hardware Installation Guide Americas HeadquartersPage N T E N T S Airflow Direction Chassis Weight Chassis and Module Information E-4 Contents Audience OrganizationChapter and Title Description Conventions Bewaar Deze InstructiesGuarde Estas Instruções Spara Dessa Anvisningar GEM Disse Anvisninger Xii Related Documentation Configuration Guides Installation and Upgrade GuidesCommand References Error and System MessagesObtaining Documentation and Submitting a Service Request Xvi Cisco Nexus 3016 Switch Airflow Direction Layer 3 License Part NumberChassis for the Cisco Nexus 3016 Switch Front View of the Cisco Nexus 3016 SwitchPorts for the Cisco Nexus 3016 Switch ID LEDPower Supply for the Cisco Nexus 3016 Switch Airflow Direction Power Supply Part NumberFan Tray for the Cisco Nexus 3016 Switch Port Connections for the Cisco Nexus 3016 SwitchPart Number Transceivers and Cables Cisco Nexus 3048 Switch Chassis for the Cisco Nexus 3048 SwitchPower Supply Airflow Direction Layer 3 License Part Number Front View of the Cisco Nexus 3048 Switch Ports for the Cisco Nexus 3048 Switch Rear View of the Cisco Nexus 3048 SwitchPower Supply for the Cisco Nexus 3048 Switch Fan Tray for the Cisco Nexus 3048 Switch Port Connections for the Cisco Nexus 3048 SwitchCisco Nexus 3064 Switch Chassis for the Cisco Nexus 3064 Switch Front View of the Cisco Nexus 3064 SwitchPorts for the Cisco Nexus 3064 Switch Rear View of the Cisco Nexus 3064 SwitchPower Supply for the Cisco Nexus 3064 Switch Fan Tray for the Cisco Nexus 3064 SwitchPort Connections for the Cisco Nexus 3064 Switch Cisco Nexus 3548 Switch Chassis for the Cisco Nexus 3548 SwitchPower Supplies Fan tray Ports for the Cisco Nexus 3548 Switch Rear View of the Cisco Nexus 3548 SwitchPower Supply for the Cisco Nexus 3548 Switch Fan Tray for the Cisco Nexus 3548 SwitchPort Connections for the Cisco Nexus 3548 Switch SFP-10G-ER Cisco Nexus 3000 Series Hardware Installation Guide Statement Preparing for Installation Installation Options with Racks and CabinetsAirflow Direction Chassis Weight Installation GuidelinesCisco Nexus 3000 Series Hardware Installation Guide Installing the Switch Unpacking and Inspecting the SwitchQuantity Part Description ChassisStep Installing the Slider Rails Sliding the Chassis Into the Rack Grounding the Switch Electrostatic Discharge Damage, page·2-14Proper Grounding Practices Environment Severity Level Grounding RecommendationsEstablishing the System Ground Required Tools and Equipment Grounding the Cisco Nexus 3000 Series ChassisPreventing Electrostatic Discharge Damage Grounding a Cisco Nexus 3000 Series ChassisOL-25338-04 Attaching the ESD Wrist Strap to the System Ground Lug Screw Starting the Switch 331410 OL-25338-04 Cisco Nexus 3000 Series Hardware Installation Guide Connecting to the Network Connecting to the Console Port Preparing for Network ConnectionsConnecting to the Management Port Connecting to a ServerInstalling and Replacing SFP or SFP+ Transceivers Installing an SFP or SFP+ TransceiverInstalling Optical Cables into SFP or SFP+ Transceivers Replacing an SFP or SFP+ TransceiverInstalling an Optical Cable into an SFP or SFP+ Transceiver Maintaining SFP and SFP+ Transceivers and Fiber-Optic Cables Cisco Nexus 3000 Series Hardware Installation Guide Replacing a Power Supply Removing an AC Power SupplyInstalling an AC Power Supply Removing a DC Power Supply Installing a DC Power Supply Replacing a Fan TrayRemoving a Fan Tray, Installing a Fan Tray, Removing a Fan TrayInstalling a Fan Tray Cabinet and Rack Requirements General Requirements for Cabinets and RacksRequirements Specific to Perforated Cabinets Requirements Specific to Standard Open RacksCable Management Guidelines Cisco Nexus 3000 Series Hardware Installation Guide Switch Specifications Environmental SpecificationsSwitch Height Width Depth Weight Power Specifications Property Cisco Nexus 3000 Series SwitchProperty AC Power Supply N2200-PAC-400 W Property AC Power Supply N2200-PAC-400 W Appendix B Technical Specifications Power Specifications Cable and Connector Specifications Console CableSupported Power Cords and Plugs Console PortLength Description Feet Meters IllustrationCAB-N5K6A-NA CAB-9K10A-AU Figure C-6 SFS-250V-10A-ID CAB-9K10A-SW CAB-N5K6A-NA Jumper Power Cord Figure C-15LED Descriptions Chassis and Module LED Descriptions ComponentStatus Description Power Supply Status Port LEDsCondition Fail LED Status AmberRight Off No activity Blinking green Activity Site Planning and Maintenance Records Site Preparation ChecklistTask No Planning Activity Verified By Time Date Contact and Site Information Chassis and Module Information D E IN-2 IN-3 IN-4 IN-5 IN-6